How to build your Barrel Six

1

When it arrives

What comes in the crate?

The whole barrel, flat-packed in one timber crate, 3.4 × 1.2 × 1 m: the boards, end walls and cradles, the benches and seats, two glass doors, the shingles, four steel straps and every fixing.

A sauna packed in its timber crate on pallets, film-wrapped and strapped
Film-wrapped and strapped, on its pallets
The changing room of the Barrel Six: a storage bench and the glass door into the hot room
Two glass doors, in their frames
Two people carrying the boards from the crate along a side path to the garden, a sack truck beside the crate
The last metres are yours: two people and a sack truck
  • The barrel: 87 wall boards, 3.35 m long, six end-wall panels, four base cradles and the floor panels, cut to size and numbered to the drawings.
  • Inside: two alder benches, 184 × 50 cm, with backrests, for the hot room; two storage benches for the changing room; two porch seats.
  • Two glass doors: 8 mm toughened glass, 1770 × 690 mm, in their frames, with timber handles and roller catches.
  • Air and drain: an adjustable inlet and an extract grille for the back wall, and a stainless drain plate for the floor.
  • Straps and fixings: four steel straps and about 1,911 fixings, bagged by size.
  • The roof: 120 bitumen shingles, with the roofing nails and starter battens.
A sauna packed in its timber crate on pallets, film-wrapped and strapped
Film-wrapped and strapped, on its pallets
Through both glass doors of the Barrel Six to the wood-burning stove at the far end of the hot room
The stove and its flue kit travel in the same crate
The changing room of the Barrel Six: a storage bench and the glass door into the hot room
Two glass doors, in their frames
Two people carrying the boards from the crate along a side path to the garden, a sack truck beside the crate
The last metres are yours: two people and a sack truck
  • The barrel: 87 wall boards, 3.35 m long, six end-wall panels, four base cradles and the floor panels, cut to size and numbered to the drawings.
  • Inside: two alder benches, 184 × 50 cm, with backrests, for the hot room; two storage benches for the changing room; two porch seats.
  • Two glass doors: 8 mm toughened glass, 1770 × 690 mm, in their frames, with timber handles and roller catches.
  • Air and drain: an adjustable inlet and an extract grille for the back wall, and a stainless drain plate for the floor.
  • Straps and fixings: four steel straps and about 1,911 fixings, bagged by size.
  • The roof: 120 bitumen shingles, with the roofing nails and starter battens.
  • The stove and flue kit: the ETNA 12 with its stand, stone guard and heat shields, and the flue kit, Ø115 mm, up to the rain cap.

Not in the crate

A 20 kg box of Harvia sauna stones – Barrel Six sauna
Stones: 20 kg a box
  • Exterior wood treatment and a brush: a preservative or stain for the outside only, at stage 4. Any DIY shop sells it.
  • Sealant and foam: bituminous sealant for the roof and expanding foam for the door frames and the roof joint, as the manual shows.
  • Sauna stones: the Harvia Cilindro takes a full 80 kg, in 20 kg boxes, sold separately.
  • The heater circuit: your electrician’s work, not in our price.
  • Your tools: the list is in the next chapter, and on page 3 of the manual.
  • Exterior wood treatment and a brush: a preservative or stain for the outside only, at stage 4. Any DIY shop sells it.
  • Sealant and foam: bituminous sealant for the roof and expanding foam for the door frames and the roof joint, as the manual shows.
  • Sauna stones: the ETNA 12 takes a full 80 kg, in 20 kg boxes, sold separately.
  • Under and round the stove: a non-combustible plate under the stove, high-temperature flue sealant and rock wool for round the firebox.
  • The Part J sign-off: building control or a registered installer signs off the stove and flue: not in our price.
  • Your tools: the list is in the next chapter, and on page 3 of the manual.
Added black-framed doors or the Black Edition? The doors come in their frames, the same size; the graphite shingles go on in place of the standard ones. The LED lighting kit goes in with the benches, at stage 5. Chose the panoramic back wall? It is built into the barrel at the factory: a half-round panel of 8 mm toughened glass, 2100 × 1050 mm, in the upper back wall of the hot room.
Added black-framed doors or the Black Edition? The doors come in their frames, the same size; the graphite shingles go on in place of the standard ones. The LED lighting kit goes in with the benches, at stage 5.
2

Before you build

What do you need before you start?

Two people, the tools on page 3 of the manual, every part counted, and the base ready, level and square.

  • Two peopleTwo people build it from the manual, with ordinary tools and some cutting. Rather not build it? Find a local fitter.
  • The manual, read firstOne 31-page manual for both editions, every step drawn. Skip the stove pages, 19 to 23 and 31, and leave the stove opening uncut.
  • Every part thereCount the parts against pages 4 to 6. Short or damaged? Note it on the delivery note, take photos and tell us within 14 days: we replace it free.
  • Within two weeksKeep the timber flat and dry until it goes in, and build within two weeks of delivery: timber that sits damp can warp.
  • The spot and the baseClose to the house, the outer glass door towards the fence or the house, with room to walk round it and reach the straps; the base ready, as in the next chapter.
  • Your electrician, bookedThe heater needs its own circuit from the consumer unit, 35 A for the Harvia PC70: a qualified electrician’s job, not in our price. Book it before delivery.

Tools · page 3 of the manual

  • Cordless drill-driver, TORX T25 and PZ2 bits
  • Drill, Ø8 mm bit
  • Jigsaw
  • Rubber mallet
  • Hammer
  • Knife
  • Two spanners
  • Tape measure
  • Spirit level
  • Sealant gun

Some cutting: the last wall boards are trimmed to fit.

  • Two peopleTwo people build it from the manual, with ordinary tools and some cutting. Rather not build it? Find a local fitter.
  • The manual, read firstOne 31-page manual for both editions, every part and step drawn: the stove pages are 19 to 23 and 31.
  • Every part thereCount the parts against pages 4 to 7. Short or damaged? Note it on the delivery note, take photos and tell us within 14 days: we replace it free.
  • Within two weeksKeep the timber flat and dry until it goes in, and build within two weeks of delivery: timber that sits damp can warp.
  • The spot and the baseClose to the house, the outer glass door towards the fence or the house, with room to walk round it and reach the straps; the base ready, as in the next chapter.
  • Installer and councilBuilding control or a registered installer signs off the stove and flue under Part J: not in our price. Check smoke control at your address with your council.

Tools · page 3 of the manual

  • Cordless drill-driver, TORX T25 and PZ2 bits
  • Drill, Ø8 mm bit
  • Jigsaw
  • Rubber mallet
  • Hammer
  • Knife
  • Two spanners
  • Tape measure
  • Spirit level
  • Sealant gun

Some cutting: the last wall boards are trimmed to fit, and the stove opening and the flue hole are cut.

3

Before you build

What base does it need?

A firm, level base the size of the barrel, 340 × 220 cm: a concrete slab, paving slabs or compacted gravel. The barrel brings its own floor and four cradles.

The Barrel Six from its long side, in a garden: four timber cradles on a paved base, the steel straps and the shingle roof
Four cradles carry it, on a paved base
The Barrel Six from the back, in a garden: the round end wall with its vent, on its cradles
From the back: the end wall on its cradles
The Barrel Six wood-fired cut open along one side: the porch, both rooms and the stove, on four cradles
Cut open: the barrel on its four cradles
The Barrel Six wood-fired from above, the roof cut away: the floor, the benches and the stove, over the cradles
From above: the floor over the cradles

How it stands on the ground

  • Four cradles, set levelTreated first, then set level on the base, 800, 860 and 860 mm apart.
  • Square and levelMeasure both diagonals: when they are equal, the cradles are square. Then check them with the level.
  • The size of the barrelMake the base 340 × 220 cm: a base that sticks out past the walls holds rain against them.
  • Free-drainingNo mains water is needed: the floor drain empties under the barrel, so the ground beneath must drain freely.
4

Building it

How is it built, step by step?

In the manual’s order: the cradles and the floor, the walls up and over, the porch seats, the outside treated and the straps, the benches; then the vents, both doors and the shingles.

One manual covers both editions. Skip the stove pages, 19 to 23 and 31, leave the stove opening on page 12 uncut, and where a drawing shows a flue, leave it out.
1

Before you start · manual pages 4 to 6

Unpack and sort the parts

Photographing the crate at the kerb before signing the delivery note
Timber parts laid out on a paved path and counted
Drawing from the Barrel Six manual, page 4: the fixings, the steel straps and their fittings, the handles, the vents and the drain plate
Manual, page 4
Drawing from the Barrel Six manual, page 6: the cradles, the wall boards, the end-wall panels and the shingles
Manual, page 6

Lay everything out by code and count it against the parts pages: every part is drawn there with its code and how many come.

  • Before you sign: photograph the crate and note any damage on the delivery note.
  • Boards, end-wall panels, cradles, benches, doors and fittings, each in their own pile.
  • Every page of the manual lists the parts and fixings it uses, by code and count.
  • Anything short or damaged? Tell us within 14 days and we replace it free, delivery included.
2

Manual pages 8 and 9

Lay the cradles and the floor

The stainless drain plate in the floor boards
Drawing from the Barrel Six manual, page 8: four cradles, 800, 860 and 860 mm apart
Manual, page 8
Drawing from the Barrel Six manual, page 9: the drain board across the cradles, then the floor boards out from it
Manual, page 9

Four cradles, treated, level and square on the base; then the floor, out from the drain board in the middle, each board treated underneath.

  • Treat the four cradles first, then set them level on the base, 800, 860 and 860 mm apart.
  • Measure both diagonals: when they are equal, the cradles are square.
  • The drain board, with its hole, across the middle; then the floor boards out from it to both sides.
  • Treat the underside of each floor board before it goes down.
3

Manual pages 10 to 12

Stand the end walls, build the walls up and over

The Barrel Six with its walls up and over, before the outside is treated
Drawing from the Barrel Six manual, page 10: the lower end walls and the partition on the floor
Manual, page 10
Drawing from the Barrel Six manual, page 11: the boards up both sides and over the top
Manual, page 11
Drawing from the Barrel Six manual, page 12: the temporary battens off, the drain plate in
Manual, page 12

The lower end walls and the partition stand on the floor; then the boards go up both sides and over the top, and the last ones are trimmed to fit.

  • Drill the floor where page 10 marks it, then stand the lower panels of both end walls and the partition.
  • The boards go up both sides, the upper end-wall panels on top, and on over the curve.
  • The last boards are trimmed to fit with the jigsaw.
  • Take the temporary battens off the end walls and fit the drain plate over the hole in the floor.
4

Manual pages 14 to 16

Porch seats, the outside treated, the straps on

The Barrel Six with its porch seats, the outside treated and the steel straps on, before the doors and the shingles
Drawing from the Barrel Six manual, page 14: a seat either side of the door, on the porch
Manual, page 14
Drawing from the Barrel Six manual, page 15: the outside treated from the base up to 1.6 m
Manual, page 15
Drawing from the Barrel Six manual, page 16: four steel straps, each joined with brackets, a threaded rod and nuts
Manual, page 16

A seat either side of the door on the porch; the outside treated from the base up to 1.6 m; then four steel straps round the barrel, tightened evenly.

  • The two porch seats, one either side of the door.
  • Outside only, from the base up to 1.6 m where the manual marks it, and both end walls in full: the shingles do not cover them.
  • The inside stays bare wood: walls, floor, benches and backrests. Pick a dry day above +10 °C.
  • Four straps round the barrel, each joined with two brackets, a threaded rod and two nuts: tighten the nuts evenly with two spanners.
5

Manual pages 13, 17 and 18

Benches inside

A storage bench in the corner of the Barrel Six changing room
Drawing from the Barrel Six manual, page 13: where the benches, backrests, floor panels, storage benches and porch seats go
Manual, page 13
Drawing from the Barrel Six manual, page 17: the hot-room benches and their backrests
Manual, page 17
Drawing from the Barrel Six manual, page 18: the storage benches in the changing room
Manual, page 18

Two benches with backrests face each other in the hot room; a storage bench goes either side of the changing room.

  • Page 13 shows where everything goes: the benches S1840 with their backrests H1750, the floor panels P750 and P800, the storage benches D840.
  • In the hot room: the two benches, 184 × 50 cm, on their legs, a backrest above each.
  • In the changing room: a storage bench either side.
  • Added the LED lighting kit? Fit it now, while the benches go in, as its fitting guide shows.

Wood-fired: the stove goes in now · pages 19 to 23

  • The openingsThe stove opening, 440 × 740 mm, in the back wall where page 12 marks it; the flue hole, 285 × 285 mm, 150 mm from the back wall.
  • Stand, guard and shieldsThe floor by the stove cut as page 20 shows; the stand and the stone guard; the stove with its firebox through the wall, a heat shield inside and out, rock wool round the firebox.
  • The flue, in orderUp through the roof, section by section, as page 23 numbers them. The flashing and the rain cap go on with the shingles, page 31.
6

Manual pages 24 and 25

Vents, then the roof joint

The round timber vent cover on the inside of the back wall
Drawing from the Barrel Six manual, page 24: the vent: the valve inside, the grille outside
Manual, page 24
Drawing from the Barrel Six manual, page 25: the trims along the top inside, foam along the joint outside
Manual, page 25

The vents go into the back wall; then the trims along the top inside, and foam along the joint at the top outside.

  • The vents SET3 in the back wall, as page 24 draws them: the adjustable valve inside, the grille outside.
  • Inside, the trims along the top, room by room, as page 25 draws them.
  • Outside, expanding foam along the joint at the top; trim it flush with a knife once it has set.
7

Manual pages 26 and 27

Fit both door frames

A hinge and the catch on a glass sauna door – Barrel Six sauna
Drawing from the Barrel Six manual, page 26: the door frame in its opening, outside view
Manual, page 26
Drawing from the Barrel Six manual, page 27: the trims outside, 20 mm from the frame
Manual, page 27

Each glass door comes in its frame: screw the frame into its opening, foam the gap round it, then fix the trims outside.

  • The outer door opens into the changing room, the inner one into the hot room: both come in their frames.
  • Each frame screwed into its opening, the screw heads under their caps, the gap round it filled with expanding foam.
  • Outside, the trims W1800 and W840, 20 mm from the frame.
8

Manual pages 28 and 29

Trims inside, handles and catches

The turned timber handle through the glass door
Drawing from the Barrel Six manual, page 28: the trims inside and the handle, inside view
Manual, page 28
Drawing from the Barrel Six manual, page 29: the handle through the glass and the catch in the frame
Manual, page 29

The trims round each frame inside, then the timber handles through the glass and the catches in the frames.

  • Inside, the trims WS1750 and W800 round each frame.
  • The handle SET2: a turned knob each side of the glass.
  • The roller catch sits in the door frame and holds the door shut. There is no key lock.
9

Manual page 30

Shingles, then a last check

A steel strap and its tensioner on the timber wall
Drawing from the Barrel Six manual, page 30: the starter battens at 1.4 m, then the shingles in rows
Manual, page 30

A starter batten along each side at 1.4 m, then 120 shingles in overlapping rows up and over the top. Then walk round once.

  • The starter battens WS1675 at 1.4 m each side, the first row of shingles nailed on them, then the overlapping rows up and over the top.
  • The manual shows the rows and how many nails each shingle takes.
  • Last walk round: the straps tightened evenly, both doors closing onto their catches, the vents turning freely, the outside treated and dry.
Wood-fired: with the shingles, the flashing goes over the flue, nailed and sealed into them, then the rain cap: page 31, drawn in the stove chapter below.
5

Building it

How does the heater go in?

Once the barrel is built: the Harvia heater stands on the back wall of the hot room, between the benches, where Harvia’s manual puts it. A qualified electrician runs its own circuit, makes the connection and certifies the work: that is not in our price.

Sauna stones going into the basket of a Harvia Cilindro pillar heater
Stones in the basket: a full 80 kg
  • Harvia Cilindro PC70 or PC90: pillar heaters, 6.8 kW and 9 kW, with the timer and thermostat on the heater; chosen in your build.
  • PC70E or PC90E: the same heaters with Wi-Fi control, from a separate BleBox unit outside the hot room.
  • Where it goes: on the back wall, between the benches. The manual draws the wood-fired stove there: take the spot, the clearances and the fixing from Harvia’s manual, in the heater box.
  • The supply: its own circuit from the consumer unit, 35 A for the PC70, in rubber cable of type H07RN-F or equivalent, as Harvia specifies. PVC is not permitted.
  • Your electrician: fits the supply, makes the connection and certifies the work.
  • Stones: a full 80 kg, in 20 kg boxes, sold separately, loaded as Harvia’s manual sets out.
5

Building it

How do the stove and flue go in?

During the build, after the benches: pages 19 to 23 of the manual. The ETNA 12 stands behind its stone guard on the back wall, between the benches, and its firebox passes through the wall: logs and ash stay outside.

The hot room of the Barrel Six: the ETNA stove at the back wall, between the benches
At the back wall, between the benches
Inside a wood-fired barrel sauna: the stove in its cage of stones at the back wall, the flue rising from it
In its stone guard, the flue rising from it
The stove fire door on the outside of the back wall, in its heat shield
Fed from outside, through the back wall
  • The ETNA 12: in the price, with its stand, stone guard and heat shields; the maker rates it for rooms of 6 to 12 m³ and logs up to 400 mm.
  • Fed from outside: the firebox passes through a 440 × 740 mm opening in the back wall. Leave standing room behind the barrel and keep the logs dry nearby.
  • The flue kit: single-wall pipe Ø115 mm, a damper, a transition, twin-wall pipe Ø115/195 mm, heat shields, a rosette, roof flashing 450 × 450 mm and a rain cap.
  • The sign-off: building control or a registered installer, under Part J in England and Wales: not in our price.
  • Stones: a full 80 kg, sold separately.

The stove pages of the manual, in order

Drawing from the Barrel Six manual, page 19: the flue hole, 285 × 285 mm, 150 mm from the back wall, and its roof plate
Page 19 · the flue hole and its plate
Drawing from the Barrel Six manual, page 20: for the standard stove, 400 mm cut off one floor section, fixed as a separate piece
Page 20 · the floor by the stove
Drawing from the Barrel Six manual, page 21: the stand and the stone guard put together round the stove
Page 21 · the stand and the stone guard
Drawing from the Barrel Six manual, page 22: the stove through the back wall, heat shields inside and out, rock wool round the firebox
Page 22 · through the wall, the shields
Drawing from the Barrel Six manual, page 23: the flue sections up through the roof, in order
Page 23 · the flue, in order
Drawing from the Barrel Six manual, page 31: the flashing, the clamp and the rain cap round the flue, sealed into the shingles
Page 31 · the flashing and the rain cap

Stoves you can choose

StoveFed fromGlass fire doorStones, sold separately
ETNA 12 (standard)Outside, through the wallNoA full 80 kg
ETNA 12 SNInside the hot roomYes, facing the roomA full 80 kg
Stoveman 13R-LSOutside, through the wallYes, on the outside90 to 110 kg
Cozy 12 O-TWOutside, through the wallYes, on the outside90 to 100 kg

If you chose another stove, follow its own manual, and ask us before you cut the opening. The stove maker’s manual gives the distances to timber and how to protect the floor.

6

Building it

Where is the full manual?

In one 31-page manual for both editions: every part with its code on the parts pages, then every step drawn, from the cradles on page 8 to the shingles on page 30.

The whole manual: 31 pagesDownload the PDF