Gable 2.77 & Wide: assembly & care

1

When it arrives

What comes on the pallet?

The frame, the polycarbonate sheets, both doors, the ground anchors and every fixing, all on one pallet.

A SteelRoot unpacked on the ground: arches, bars, boxes and the rolled sheets
Unpacked: arches, bars, boxed fittings and the rolled sheets

In the box

  • The galvanised steel frame: arches, crossbars and two end frames, each with a stable door whose top half opens.
  • Ground anchors for soil.
  • Every bolt and screw, bagged and counted: M6 bolts, nuts and washers, roofing screws and 4.2 mm screws.
  • Free with your order: breather tape for the bottom ends of the roof sheets, solid tape for the cut edges of the end walls, doors and vents, and a plant-support wire.
  • The packing list, to check every part against.

Sheets for each length

LengthPolycarbonate sheets
4 m3 sheets, 2.1 × 6 m
6 m4 sheets, 2.1 × 6 m
8 m5 sheets, 2.1 × 6 m
10 m6 sheets, 2.1 × 6 m
12 m7 sheets, 2.1 × 6 m
Roof vents are an option you choose in the configurator; the U-profile and arch straps are added on request.
1

When it arrives

What comes on the pallet?

The frame, the polycarbonate sheets, both doors, four end-wall windows, the ground anchors and every fixing, all on one pallet.

A SteelRoot unpacked on the ground: arches, bars, boxes and the rolled sheets
Unpacked: arches, bars, boxed fittings and the rolled sheets

In the box

  • The galvanised steel frame: arches, crossbars and two end frames, each with a stable door and two windows.
  • Ground anchors for soil.
  • Every bolt and screw, bagged and counted: M6 bolts, nuts and washers, roofing screws and 4.2 mm screws.
  • Free with your order: breather tape for the bottom ends of the roof sheets, solid tape for the cut edges of the end walls, doors and vents, and a plant-support wire.
  • The packing list, to check every part against.

Sheets for each length

LengthPolycarbonate sheets
4 m3 sheets, 2.1 × 7 m
6 m4 sheets, 2.1 × 7 m
8 m5 sheets, 2.1 × 7 m
10 m6 sheets, 2.1 × 7 m
12 m7 sheets, 2.1 × 7 m
Roof vents are an option you choose in the configurator; the U-profile and arch straps are added on request.
2

Before you build

What base does it need?

A firm, level base 3,000 mm wide and 250 mm longer than the greenhouse: on the ground the frame is 2,760 mm across the outside of the legs. Check that width across the end frames before you cut or pour the base to its final size.

The base marked out: the outer line with open soil inside
Marked out on soil
A SteelRoot Gable on a timber base frame – SteelRoot Gable 2.77 greenhouse
Or a timber base frame
LengthFrame footprintBase: build to thisDiagonal of the footprintDiagonal of the base
4 m2,760 × 4,020 mm3,000 × 4,250 mm4,876 mm5,202 mm
6 m2,760 × 6,020 mm3,000 × 6,250 mm6,623 mm6,933 mm
8 m2,760 × 8,020 mm3,000 × 8,250 mm8,482 mm8,779 mm
10 m2,760 × 10,020 mm3,000 × 10,250 mm10,393 mm10,680 mm
12 m2,760 × 12,020 mm3,000 × 12,250 mm12,333 mm12,612 mm

How it stands on the ground

  • Along the long sides the frame stands on the ends of its arch legs.
  • Across each end, the end frame lies flat on the ground, door included: there is no gap under the door.
  • Build the base as a continuous line all round, not pads under each leg.
2

Before you build

What base does it need?

A firm, level base 3,200 mm wide and 250 mm longer than the greenhouse: build to the base size below, not to the 2.99 in the name. Check the width across the end frames before you cut or pour it to its final size.

The base marked out: the outer line with open soil inside
Marked out on soil
A SteelRoot Gable on a timber base frame – SteelRoot Gable Wide 2.99 greenhouse
Or a timber base frame
LengthFrame footprintBase: build to thisDiagonal of the footprintDiagonal of the base
4 m2,990 × 4,020 mm3,200 × 4,250 mm5,010 mm5,320 mm
6 m2,990 × 6,020 mm3,200 × 6,250 mm6,722 mm7,022 mm
8 m2,990 × 8,020 mm3,200 × 8,250 mm8,559 mm8,849 mm
10 m2,990 × 10,020 mm3,200 × 10,250 mm10,457 mm10,738 mm
12 m2,990 × 12,020 mm3,200 × 12,250 mm12,386 mm12,661 mm

How it stands on the ground

  • Along the long sides the frame stands on the ends of its arch legs.
  • Across each end, the end frame lies flat on the ground, door included: there is no gap under the door.
  • Build the base as a continuous line all round, not pads under each leg.
3

Before you build

How long does it take, and which tools?

Two adults with ordinary tools, once the base is ready.

4 mAbout 1 day
6 m and 8 mAbout 2 days
10 m and 12 mAbout 3 days
A cordless drill fixing a polycarbonate sheet to the end arch of a SteelRoot greenhouse
A cordless drill does most of the work

Tools

  • Cordless drill-driver with a PH2 bit
  • Spanner set
  • Spirit level and tape measure
  • Sharp knife or fine-tooth jigsaw, for the end-wall sheets
  • Spade, for the ground anchors
  • Stepladder and work gloves

Nothing is welded and you never cut the steel. Read the whole manual before you start, and lay the frame out loosely: tighten the bolts only once the whole frame stands, so any misalignment can still be corrected.

4

Building it

What is the order of work?

The arches and both end walls first, then the frame, the anchors and the roof sheets, and the doors last.

A real build, frame to finish A SteelRoot Gable 2.77.
SteelRoot assembly, step by step On our YouTube channel.
Doors and roof vent How they open.
The twin-wall roof

A Gable 2.77 going up, in the order of its manual. Where a step has two versions, follow your arch spacing, 1.00 m or 0.67 m.

  1. 1
    Arches and end frames

    Bolt each arch together from its sections; build the two end frames, the door frame between the bottom bars; then fit an arch over each end frame. Lay it out loosely: tighten the bolts only once the whole frame stands.

    With Cordless drill-driver with a PH2 bit, spanner set

    Arch sections bolted together – SteelRoot Gable 2.77 greenhouse
    Arch sections bolted together
    A crossbar bolted to an upright – SteelRoot Gable 2.77 greenhouse
    A crossbar bolted to an upright
  2. 2
    Glaze the end walls

    Lay the sheets flat, place each end frame on them and mark round it; fix them UV side out with a screw at every edge, then trim to the frame and cut round the doors.

    With Sharp knife or fine-tooth jigsaw, PH2 bit

    Scoring a twin-wall sheet along the marked line
    Scoring a twin-wall sheet along the marked line
    An end wall glazed, cut round its doors – SteelRoot Gable 2.77 greenhouse
    An end wall glazed, cut round its doors
  3. 3
    Arches, crossbars and anchors

    Stand the arches between the end frames and bolt in the crossbars; a stepladder helps. Check both diagonals and the level, then dig in the anchors, one in every corner.

    With Stepladder, spirit level, tape measure, spade

    Both ends glazed, the arches and crossbars bolted between them
    Both ends glazed, the arches and crossbars bolted between them
    A crossbar bolted to an arch – SteelRoot Gable 2.77 greenhouse
    A crossbar bolted to an arch
  4. 4
    Roof and wall sheets

    Whole sheets over the arches, UV side out, screwed to the steel; the sheets are not cut.

    With Cordless drill-driver with a PH2 bit

    From inside: the sheets over the arches – SteelRoot Gable 2.77 greenhouse
    From inside: the sheets over the arches
    Glazed: the straight walls and the pitched roof
    Glazed: the straight walls and the pitched roof
  5. 5
    Doors

    Hinges and handles on both doors.

    The lever handle on the door frame – SteelRoot Gable 2.77 greenhouse
    The lever handle on the door frame
    The door latch – SteelRoot Gable 2.77 greenhouse
    The door latch
    Built: both doors open – SteelRoot Gable 2.77 greenhouse
    Built: both doors open
4.1Cutting the end walls
  • It is the one job that takes care. The roof sheets go on whole.
  • Hold each piece in its place, UV side out, before you cut: a piece cut mirror-wise can’t be turned over.
  • Mark on the protective film, use a new blade and score in light passes; a fine-tooth jigsaw for the curve.
  • Tape each cut edge with solid tape straight away, before the roof sheets go on, and peel the film once the sheet is screwed down.
4

Building it

What is the order of work?

The arches and the end walls with their windows first, then the frame, the anchors and the roof sheets, and the doors and windows last.

A real build, frame to finish A SteelRoot Gable 2.77.
SteelRoot assembly, step by step On our YouTube channel.
Doors and roof vent How they open.
The twin-wall roof

Shown: a Gable 2.77. The Wide 2.99 goes up in the same order, with its own end frames and windows; its manual has the parts.

  1. 1
    Arches and end frames

    Bolt each arch together from its sections; build the two end frames, the door frame between the bottom bars; then fit an arch over each end frame. Lay it out loosely: tighten the bolts only once the whole frame stands.

    With Cordless drill-driver with a PH2 bit, spanner set

    Arch sections bolted together – SteelRoot Gable Wide 2.99 greenhouse
    Arch sections bolted together
    A crossbar bolted to an upright – SteelRoot Gable Wide 2.99 greenhouse
    A crossbar bolted to an upright
  2. 2
    Glaze the end walls

    Lay the sheets flat, place each end frame on them and mark round it; fix them UV side out with a screw at every edge, then trim to the frame and cut round the doors and the windows. The window frames go in first, one each side of the door.

    With Sharp knife or fine-tooth jigsaw, PH2 bit

    Scoring a twin-wall sheet along the marked line
    Scoring a twin-wall sheet along the marked line
    An end wall glazed, cut round its doors – SteelRoot Gable Wide 2.99 greenhouse
    An end wall glazed, cut round its doors
  3. 3
    Arches, crossbars and anchors

    Stand the arches between the end frames and bolt in the crossbars; a stepladder helps. Check both diagonals and the level, then dig in the anchors, one in every corner.

    With Stepladder, spirit level, tape measure, spade

    Both ends glazed, the arches and crossbars bolted between them
    Both ends glazed, the arches and crossbars bolted between them
    A crossbar bolted to an arch – SteelRoot Gable Wide 2.99 greenhouse
    A crossbar bolted to an arch
  4. 4
    Roof and wall sheets

    Whole sheets over the arches, UV side out, screwed to the steel; the sheets are not cut.

    With Cordless drill-driver with a PH2 bit

    From inside: the sheets over the arches – SteelRoot Gable Wide 2.99 greenhouse
    From inside: the sheets over the arches
    Glazed: the straight walls and the pitched roof
    Glazed: the straight walls and the pitched roof
  5. 5
    Doors and windows

    Hinges and handles on both doors, then the end-wall windows.

    The lever handle on the door frame – SteelRoot Gable Wide 2.99 greenhouse
    The lever handle on the door frame
    The door latch – SteelRoot Gable Wide 2.99 greenhouse
    The door latch
    Built: both doors open – SteelRoot Gable Wide 2.99 greenhouse
    Built: both doors open
4.1Cutting the end walls
  • It is the one job that takes care. The roof sheets go on whole.
  • Hold each piece in its place, UV side out, before you cut: a piece cut mirror-wise can’t be turned over.
  • Mark on the protective film, use a new blade and score in light passes; a fine-tooth jigsaw for the curve.
  • Tape each cut edge with solid tape straight away, before the roof sheets go on, and peel the film once the sheet is screwed down.
5

Building it

How is it anchored?

Ground anchors in the box hold it on firm, level soil, without concrete; on a hard base, bolt-down U-brackets you buy hold it instead.

The ground anchors: bent galvanised profile – SteelRoot Gable greenhouse
The ground anchors that come with it

Each ground anchor is a bent steel profile. It slides into the foot of a leg, takes one screw and is dug into firm, level soil, with no concrete. There is one at every corner without exception; the manual shows where the rest go.

An unanchored greenhouse is not covered for structural failure. The conditions are on the SteelRoot warranty tab.

Anchors for each length

LengthAnchors at 1.00 m arch spacingAnchors at 0.67 m arch spacing
4 m68
6 m810
8 m1012
10 m1214
12 m1416
5.1On a hard base

On concrete, slabs, bricks, sleepers or a timber ring the anchors are not used: a bolt-down U-bracket goes under every leg, with masonry bolts on concrete or slabs and coach screws on timber. They are not supplied, and any builders’ merchant or fixings supplier has them.

6

Building it

What does the manual show, step by step?

15 numbered steps on pages 6 to 21, with every part and its code on pages 4 and 5. Where a step comes in two versions, follow only the one for your arch spacing, 1.00 m or 0.67 m.

  1. Step 1: Bolt the arches together – SteelRoot Gable 2.77 greenhouse
    1Bolt the arches togetherPage 6. A 4 m frame has five arches at 1.00 m spacing and seven at 0.67 m.
  2. Step 2: Get the end-frame bars ready – SteelRoot Gable 2.77 greenhouse
    2Get the end-frame bars readyPage 7. The door-frame and bottom bars for both ends, with their brackets.
  3. Step 3: Build the two end frames – SteelRoot Gable 2.77 greenhouse
    3Build the two end framesPage 8. The door frame sits between the bottom bars. The width on this page is the frame’s, not your base’s.
  4. Step 4: Fit an arch over each end frame – SteelRoot Gable 2.77 greenhouse
    4Fit an arch over each end framePage 9.
  5. Step 5: Mark the end-wall sheet – SteelRoot Gable 2.77 greenhouse
    5Mark the end-wall sheetPage 10. Lay one sheet flat, place the end frames on it and mark round them.
  6. Step 6: Fix and cut the end walls – SteelRoot Gable 2.77 greenhouse
    6Fix and cut the end wallsPage 11. UV side out, a screw at every edge, then trim to the frame and cut round the doors.
  7. Step 7: Arches and crossbars, 1.00 m spacing – SteelRoot Gable 2.77 greenhouse
    7Arches and crossbars, 1.00 m spacingPage 12. Stand the arches between the end frames and bolt in the crossbars. A stepladder helps.
  8. Step 8: Arches and crossbars, 0.67 m spacing – SteelRoot Gable 2.77 greenhouse
    8Arches and crossbars, 0.67 m spacingPage 13. The same job with the closer arches.
  9. Step 9: Square, level and anchor, 1.00 m spacing
    9Square, level and anchor, 1.00 m spacingPage 14. Check both diagonals and the level, then dig in the anchors: six on a 4 m frame.
  10. Step 10: Square, level and anchor, 0.67 m spacing
    10Square, level and anchor, 0.67 m spacingPage 15. Eight anchors on a 4 m frame.
  11. Step 11: Roof sheets, 1.00 m spacing – SteelRoot Gable 2.77 greenhouse
    11Roof sheets, 1.00 m spacingPage 16. Whole sheets over the arches, screwed to the steel.
  12. Step 12: Roof sheets, 0.67 m spacing – SteelRoot Gable 2.77 greenhouse
    12Roof sheets, 0.67 m spacingPage 17.
  13. Step 13: Hang the doors – SteelRoot Gable 2.77 greenhouse
    13Hang the doorsPage 18. Hinges and handles on both doors.
  14. Step 14: Each extra 2 m – SteelRoot Gable 2.77 greenhouse
    14Each extra 2 mPages 20 and 21: step 14 for 1.00 m arch spacing, step 15 for 0.67 m. The parts for each 2 m section are listed on page 19.
The whole manual, page by pageDownload the PDF
6

Building it

What does the manual show, step by step?

16 numbered steps on pages 6 to 22, with every part and its code on pages 4 and 5. Where a step comes in two versions, follow only the one for your arch spacing, 1.00 m or 0.67 m.

  1. Step 1: Bolt the arches together – SteelRoot Gable Wide 2.99 greenhouse
    1Bolt the arches togetherPage 6. A 4 m frame has five arches at 1.00 m spacing and seven at 0.67 m.
  2. Step 2: Get the end-frame bars ready – SteelRoot Gable Wide 2.99 greenhouse
    2Get the end-frame bars readyPage 7. The door-frame and bottom bars for both ends, with their brackets.
  3. Step 3: Build the two end frames – SteelRoot Gable Wide 2.99 greenhouse
    3Build the two end framesPage 8. The door frame sits between the bottom bars. The width on this page is the frame’s, not your base’s.
  4. Step 4: Fit an arch over each end frame – SteelRoot Gable Wide 2.99 greenhouse
    4Fit an arch over each end framePage 9.
  5. Step 5: Fit the end-wall window frames – SteelRoot Gable Wide 2.99 greenhouse
    5Fit the end-wall window framesPage 10. One each side of the door, at both ends.
  6. Step 6: Mark the end-wall sheets – SteelRoot Gable Wide 2.99 greenhouse
    6Mark the end-wall sheetsPage 11. Lay the sheets flat, place the end frames on them and mark round them.
  7. Step 7: Fix and cut the end walls – SteelRoot Gable Wide 2.99 greenhouse
    7Fix and cut the end wallsPage 12. UV side out, a screw at every edge, then trim to the frame and cut round the doors and windows.
  8. Step 8: Arches and crossbars, 1.00 m spacing – SteelRoot Gable Wide 2.99 greenhouse
    8Arches and crossbars, 1.00 m spacingPage 13. Stand the arches between the end frames and bolt in the crossbars. A stepladder helps.
  9. Step 9: Arches and crossbars, 0.67 m spacing – SteelRoot Gable Wide 2.99 greenhouse
    9Arches and crossbars, 0.67 m spacingPage 14. The same job with the closer arches.
  10. Step 10: Square, level and anchor, 1.00 m spacing
    10Square, level and anchor, 1.00 m spacingPage 15. Check both diagonals and the level, then dig in the anchors: six on a 4 m frame.
  11. Step 11: Square, level and anchor, 0.67 m spacing
    11Square, level and anchor, 0.67 m spacingPage 16. Eight anchors on a 4 m frame.
  12. Step 12: Roof sheets, 1.00 m spacing – SteelRoot Gable Wide 2.99 greenhouse
    12Roof sheets, 1.00 m spacingPage 17. Whole sheets over the arches, screwed to the steel.
  13. Step 13: Roof sheets, 0.67 m spacing – SteelRoot Gable Wide 2.99 greenhouse
    13Roof sheets, 0.67 m spacingPage 18.
  14. Step 14: Hang the doors and windows – SteelRoot Gable Wide 2.99 greenhouse
    14Hang the doors and windowsPage 19. Hinges and handles at both ends.
  15. Step 15: Each extra 2 m, 1.00 m spacing – SteelRoot Gable Wide 2.99 greenhouse
    15Each extra 2 m, 1.00 m spacingPage 21. The parts for each 2 m section are listed on page 20.
  16. Step 16: Each extra 2 m, 0.67 m spacing – SteelRoot Gable Wide 2.99 greenhouse
    16Each extra 2 m, 0.67 m spacingPage 22.
The whole manual, page by pageDownload the PDF
7

After the build

How do I look after it, and get a part?

A yearly look over the fixings and a touch-up wherever bare steel shows; replacement parts are sent on request.

A SteelRoot Gable 2.77 at golden hour
Gable 2.77