NORDIC: assembly & care
When it arrives
What comes on the pallet?
The pine frame and its brackets, the sheets and trims, the door, the back window, the ground anchors and every screw, all on one pallet.

In the box
- The frame in 45 × 45 mm pine, every piece listed in the manual by its length, with galvanised steel brackets for every joint.
- Two spare lengths of timber, 1.4 m long.
- The door and the opening back window, with their hinges and handles.
- Polycarbonate sheets, 1.05 × 6 m, and the steel trims for the corners and the ridge.
- Ground anchors for soil, and every screw for the brackets, the trims and the sheets, counted for your length.
Sheets for each length
| Length | Polycarbonate sheets |
|---|---|
| 2 m | 4 sheets, 1.05 × 6 m |
| 3 m | 5 sheets, 1.05 × 6 m |
| 4 m | 6 sheets, 1.05 × 6 m |
Check every partThe parts list from your manual, with a tick for each, and what to do if one is missing or damagedOpen the checklist When it arrives
What comes on the pallet?
The pine frame and its brackets, the sheets and trims, the door, the back window, the ground anchors and every screw, all on one pallet.

In the box
- The frame in 45 × 45 mm pine, every piece listed in the manual by its length, with galvanised steel brackets for every joint.
- Two spare lengths of timber, 1.4 m long.
- The door and the opening back window, with their hinges and handles.
- Polycarbonate sheets, 1.05 × 6 m, and the steel trims for the corners and the ridge.
- Ground anchors for soil, and every screw for the brackets, the trims and the sheets, counted for your length.
Sheets for each length
| Length | Polycarbonate sheets |
|---|---|
| 2 m | 4 sheets, 1.05 × 6 m |
| 3 m | 5 sheets, 1.05 × 6 m |
| 4 m | 6 sheets, 1.05 × 6 m |
| 5 m | 7 sheets, 1.05 × 6 m |
| 6 m | 8 sheets, 1.05 × 6 m |
Check every partThe parts list from your manual, with a tick for each, and what to do if one is missing or damagedOpen the checklist When it arrives
What comes on the pallet?
The pine frame and its brackets, the sheets and trims, the door, the back window, the ground anchors and every screw, all on one pallet.

In the box
- The frame in 45 × 45 mm pine, every piece listed in the manual by its length, with galvanised steel brackets for every joint.
- Two spare lengths of timber, 1.4 m long.
- The door and the opening back window, with their hinges and handles.
- Polycarbonate sheets, 1.05 × 6 m, and the steel trims for the corners and the ridge.
- Ground anchors for soil, and every screw for the brackets, the trims and the sheets, counted for your length.
Sheets for each length
| Length | Polycarbonate sheets |
|---|---|
| 2 m | 4 sheets, 1.05 × 6 m |
| 3 m | 6 sheets, 1.05 × 6 m |
| 4 m | 6 sheets, 1.05 × 6 m |
| 5 m | 7 sheets, 1.05 × 6 m |
| 6 m | 8 sheets, 1.05 × 6 m |
Check every partThe parts list from your manual, with a tick for each, and what to do if one is missing or damagedOpen the checklist Before you build
What base does it need?
A firm, level base 2,020 mm wide and 250 mm longer than the greenhouse, solid under the whole perimeter. Check these sizes against the assembled base frame before you cut or pour to a final size.
| Length | Frame footprint | Base: build to this | Diagonal of the footprint | Diagonal of the base |
|---|---|---|---|---|
| 2 m | 1,800 × 2,048 mm | 2,020 × 2,250 mm | 2,727 mm | 3,024 mm |
| 3 m | 1,800 × 3,048 mm | 2,020 × 3,250 mm | 3,540 mm | 3,827 mm |
| 4 m | 1,800 × 4,048 mm | 2,020 × 4,250 mm | 4,430 mm | 4,706 mm |
2.1How it stands on the ground
- The timber base frame lies on the ground all round, door included, so the base must support the whole perimeter.
- The bottom rail runs across the doorway: the base runs unbroken under the door, and the door is a step up. Outside, lay a slab or a short ramp level with the base.
Preparing the groundClear, level and marked out before delivery day, then built to its final sizeOpen the page
Greenhouse base guideBase types and sizes for every model and lengthRead the article Before you build
What base does it need?
A firm, level base 2,370 mm wide and 250 mm longer than the greenhouse, solid under the whole perimeter. Check these sizes against the assembled base frame before you cut or pour to a final size.
| Length | Frame footprint | Base: build to this | Diagonal of the footprint | Diagonal of the base |
|---|---|---|---|---|
| 2 m | 2,150 × 2,048 mm | 2,370 × 2,250 mm | 2,969 mm | 3,268 mm |
| 3 m | 2,150 × 3,048 mm | 2,370 × 3,250 mm | 3,730 mm | 4,022 mm |
| 4 m | 2,150 × 4,048 mm | 2,370 × 4,250 mm | 4,584 mm | 4,866 mm |
| 5 m | 2,150 × 5,048 mm | 2,370 × 5,250 mm | 5,487 mm | 5,760 mm |
| 6 m | 2,150 × 6,048 mm | 2,370 × 6,250 mm | 6,419 mm | 6,684 mm |
2.1How it stands on the ground
- The timber base frame lies on the ground all round, door included, so the base must support the whole perimeter.
- The bottom rail runs across the doorway: the base runs unbroken under the door, and the door is a step up. Outside, lay a slab or a short ramp level with the base.
Preparing the groundClear, level and marked out before delivery day, then built to its final sizeOpen the page Before you build
What base does it need?
A firm, level base 2,800 mm wide and 250 mm longer than the greenhouse, solid under the whole perimeter. Check these sizes against the assembled base frame before you cut or pour to a final size.
| Length | Frame footprint | Base: build to this | Diagonal of the footprint | Diagonal of the base |
|---|---|---|---|---|
| 2 m | 2,580 × 2,048 mm | 2,800 × 2,250 mm | 3,294 mm | 3,592 mm |
| 3 m | 2,580 × 3,048 mm | 2,800 × 3,250 mm | 3,993 mm | 4,290 mm |
| 4 m | 2,580 × 4,048 mm | 2,800 × 4,250 mm | 4,800 mm | 5,089 mm |
| 5 m | 2,580 × 5,048 mm | 2,800 × 5,250 mm | 5,669 mm | 5,950 mm |
| 6 m | 2,580 × 6,048 mm | 2,800 × 6,250 mm | 6,575 mm | 6,849 mm |
2.1How it stands on the ground
- The timber base frame lies on the ground all round, door included, so the base must support the whole perimeter.
- The bottom rail runs across the doorway: the base runs unbroken under the door, and the door is a step up. Outside, lay a slab or a short ramp level with the base.
Preparing the groundClear, level and marked out before delivery day, then built to its final sizeOpen the page Before you build
How long does it take, and which tools?
Two adults, a weekend and ordinary tools, once the base is ready.

Tools
- Cordless drill-driver with a PH2 bit and an M8 socket
- Spirit level and tape measure
- Sharp knife, for the sheets
- Spade, for the ground anchors
- Stepladder
Nothing is welded and nothing is glued: the pine frame screws together in galvanised brackets. Read the whole manual before you start. Lay the frame out loosely and tighten fully only once everything lines up.
Building it
What is the order of work?
The frame first, in sections, then the anchors, then the sheets cut to the plan, wall by wall and the roof last, then the trims.
Shown: a NORDIC 2.60 going up. The 1.80 frame is built in sections: follow the drawings from its manual below.
- 1Base frame and posts
The base beams join in their galvanised brackets on the level base, then the corner and wall posts stand in theirs. Lay it out loosely and tighten fully only once everything lines up.
With Drill-driver with a PH2 bit, spirit level, tape measure
- 2Top rails and roof trusses
The top rails join the posts, the trusses go up on top, then the long roof rails run between them.
With Drill-driver, stepladder
- 3End walls, side rails and braces
The door end and the back end are framed out, then the rails go along the sides and the braces into the corners.
- 4Door and window
The door goes on its two hinges and the back window hinges at the top. Both go in before the sheets.
- 5Cut and fix the sheets
The anchors go in first. Cut the sheets to the cutting plan: mark on the film, score with a new blade, and hold each piece in place, UV side out, before you cut. Bend each roof piece over the ridge in one piece, then screw the sheets to the frame.
With Sharp knife, straight edge, drill-driver
- 6Trims and handles
The steel trims go over the sheet edges at the corners, along the roof and on the ridge; the handles go on last.
- 7Built
Glazed, trimmed and anchored. The care chapter below has the routine for the timber and the sheets.
4.1Cutting the sheets
- Every cut is drawn in the manual, with its length, and every cut is straight.
- Lay each sheet flat, UV side up, and mark on the protective film with a straight edge.
- Score along the line several times with a new blade rather than one hard cut, and lift the sheet so the cut opens as you go.
- Hold each piece in place, UV side out, before you cut: a piece cut mirror-wise can’t be turned over.
- Drill the screw holes 2 mm wider than the screw, and tape the top ends of the sheets; leave the bottom ends open so condensation drains.
Building it
What is the order of work?
The frame first, in sections, then the anchors, then the sheets cut to the plan, wall by wall and the roof last, then the trims.
Shown: a NORDIC 2.60 going up. The 2.15 frame is built in sections: follow the drawings from its manual below.
- 1Base frame and posts
The base beams join in their galvanised brackets on the level base, then the corner and wall posts stand in theirs. Lay it out loosely and tighten fully only once everything lines up.
With Drill-driver with a PH2 bit, spirit level, tape measure
- 2Top rails and roof trusses
The top rails join the posts, the trusses go up on top, then the long roof rails run between them.
With Drill-driver, stepladder
- 3End walls, side rails and braces
The door end and the back end are framed out, then the rails go along the sides and the braces into the corners.
- 4Door and window
The door goes on its two hinges and the back window hinges at the top. Both go in before the sheets.
- 5Cut and fix the sheets
The anchors go in first. Cut the sheets to the cutting plan: mark on the film, score with a new blade, and hold each piece in place, UV side out, before you cut. Bend each roof piece over the ridge in one piece, then screw the sheets to the frame.
With Sharp knife, straight edge, drill-driver
- 6Trims and handles
The steel trims go over the sheet edges at the corners, along the roof and on the ridge; the handles go on last.
- 7Built
Glazed, trimmed and anchored. The care chapter below has the routine for the timber and the sheets.
4.1Cutting the sheets
- Every cut is drawn in the manual, with its length, and every cut is straight.
- Lay each sheet flat, UV side up, and mark on the protective film with a straight edge.
- Score along the line several times with a new blade rather than one hard cut, and lift the sheet so the cut opens as you go.
- Hold each piece in place, UV side out, before you cut: a piece cut mirror-wise can’t be turned over.
- Drill the screw holes 2 mm wider than the screw, and tape the top ends of the sheets; leave the bottom ends open so condensation drains.
Building it
What is the order of work?
The base frame and the posts, the roof frame, the end walls with the door and window, then the anchors, the sheets, the trims and the handles.
A NORDIC 2.60 going up, in the order of its manual. Every length builds the same way; your manual has the exact parts.
- 1Base frame and posts
The base beams join in their galvanised brackets on the level base, then the corner and wall posts stand in theirs. Lay it out loosely and tighten fully only once everything lines up.
With Drill-driver with a PH2 bit, spirit level, tape measure
- 2Top rails and roof trusses
The top rails join the posts, the trusses go up on top, then the long roof rails run between them.
With Drill-driver, stepladder
- 3End walls, side rails and braces
The door end and the back end are framed out, then the rails go along the sides and the braces into the corners.
- 4Door and window
The door goes on its two hinges and the back window hinges at the top. Both go in before the sheets.
- 5Cut and fix the sheets
The anchors go in first. Cut the sheets to the cutting plan: mark on the film, score with a new blade, and hold each piece in place, UV side out, before you cut. Bend each roof piece over the ridge in one piece, then screw the sheets to the frame.
With Sharp knife, straight edge, drill-driver
- 6Trims and handles
The steel trims go over the sheet edges at the corners, along the roof and on the ridge; the handles go on last.
- 7Built
Glazed, trimmed and anchored. The care chapter below has the routine for the timber and the sheets.
4.1Cutting the sheets
- Every cut is drawn in the manual, with its length, and every cut is straight.
- Lay each sheet flat, UV side up, and mark on the protective film with a straight edge.
- Score along the line several times with a new blade rather than one hard cut, and lift the sheet so the cut opens as you go.
- Hold each piece in place, UV side out, before you cut: a piece cut mirror-wise can’t be turned over.
- Drill the screw holes 2 mm wider than the screw, and tape the top ends of the sheets; leave the bottom ends open so condensation drains.
Building it
How is it anchored?
Ground anchors in the box pin the base frame to firm, level soil without concrete: 4 on a 2 m greenhouse, up to 12 on a 6 m NORDIC 2.15. On a hard base, fixings you buy hold it instead.
Anchors for each length
| Length | NORDIC 1.80 | NORDIC 2.15 | NORDIC 2.60 |
|---|---|---|---|
| 2 m | 4 | 4 | 4 |
| 3 m | 6 | 6 | 6 |
| 4 m | 8 | 8 | 8 |
| 5 m | Not made | 10 | 8 |
| 6 m | Not made | 12 | 8 |
5.1Anchors: in detail
Each anchor is a steel plate with a short tube behind it. The plate sits against the outside face of the long timber beams and the tube is buried in the soil, so the frame is pinned down without concrete. Your manual marks where each one goes.

On a hard base
On concrete, slabs or bricks, galvanised angle brackets along the base frame are bolted down with masonry bolts. On sleepers or a timber ring, long exterior screws go down through the base frame into the timber, and stakes pin the sleepers. Neither is in the box: any builders’ merchant or fixings supplier has them.
Building it
What does the manual show, step by step?
One manual for every length of the NORDIC 1.80: 16 pages, the drawings without step numbers, and the cards below follow its pages.
1The greenhousePage 1. The frame with its sizes: 1.80 m wide and 2.32 m to the ridge.
2Check the partsPages 2 to 4. Every timber piece by its length, the brackets and fixings by letter, and how each bracket joins the timber.
3Read the wall drawingsPages 5 and 6. The front, back and side walls, with the length of every piece.
4Build the framePages 7 and 8. The frame goes up in sections; each extra metre of length adds the parts on page 7.
5Anchor it downPage 9. A plate on the base frame, its tube dug into the soil.
6Cut the sheetsPage 10. The cutting plan, with the size of every piece.
7Glaze the end wallsPage 11. The back wall and the front wall.
8Glaze the side wallsPage 12.
9Fit the roofPage 13. The roof pieces, cut to the plan.
10Ridge and corner trimsPages 14 and 15. The trims, then the last screws.
- Page 22Page 2
- Page 33Page 3
- Page 44Page 4
- Page 55Page 5
- Page 66Page 6
- Page 77Page 7
- Page 88Page 8
- Page 99Page 9
- Page 1010Page 10
- Page 1111Page 11
- Page 1212Page 12
- Page 1313Page 13
- Page 1414Page 14
- Page 1515Page 15
Building it
What does the manual show, step by step?
One manual for every length of the NORDIC 2.15: 16 pages, the drawings without step numbers, and the cards below follow its pages.
1The greenhousePage 1. The frame with its sizes: 2.15 m wide and 2.32 m to the ridge.
2Check the partsPages 2 to 4. Every timber piece by its length, the brackets and fixings by letter, and how each bracket joins the timber.
3Read the wall drawingsPages 5 and 6. The front, back and side walls, with the length of every piece.
4Build the framePages 7 and 8. The frame goes up in sections; each extra metre of length adds the parts on page 7.
5Anchor it downPage 9. A plate on the base frame, its tube dug into the soil.
6Cut the sheetsPage 10. The cutting plan, with the size of every piece.
7Glaze the end wallsPage 11. The back wall and the front wall.
8Glaze the side wallsPage 12.
9Fit the roofPage 13. The roof pieces, cut to the plan.
10Ridge and corner trimsPages 14 and 15. The trims, then the last screws.
- Page 22Page 2
- Page 33Page 3
- Page 44Page 4
- Page 55Page 5
- Page 66Page 6
- Page 77Page 7
- Page 88Page 8
- Page 99Page 9
- Page 1010Page 10
- Page 1111Page 11
- Page 1212Page 12
- Page 1313Page 13
- Page 1414Page 14
- Page 1515Page 15
Building it
What does the manual show, step by step?
One manual for each length of the NORDIC 2.60, its steps numbered four to a page on pages 5 to 13: the cards below follow its pages, so they fit every length.
1Every piece by colourPage 4. Each length of timber has its own colour in the drawings; the brackets and fixings go by letter.
2The base beamsPage 5, steps 1 to 4. The timber base beams joined in their brackets.
3Base frame and postsPage 6, steps 5 to 8. The base frame laid out, then the corner and wall posts in their brackets.
4Top rails and roof trussesPage 7, steps 9 to 12.
5The roof framePage 8, steps 13 to 16. All the trusses up, then the long roof rails between them.
6The end wallsPage 9, steps 17 to 20. The door end and the back end framed out.
7Side rails and bracesPage 10, steps 21 to 24. Rails along the sides, braces in the corners.
8Door and windowPage 11, steps 25 to 28. The door on its two hinges, the back window hinged at the top.
9Anchors, cutting plan, end wallsPage 12, steps 29 to 32. The anchors dug in, the sheets cut to the plan, the end walls glazed.
10Roof, side walls, trims and handlesPage 13, step 33 to the end. Each long sheet gives one roof piece and two wall pieces.
- Page 22Your base size
- Page 33Page 3
- Page 44Page 4
- Page 55Step 1
- Page 66Step 5
- Page 77Step 9
- Page 88Page 8
- Page 99Page 9
- Page 1010Step 21
- Page 1111Step 25
- Page 1212Step 29
- Page 1313Step 33
After the build
How do I look after it, and get a part?
Treat the pine frame before the sheets go in, then every 2 years, with a dated photo each time; replacement parts are sent on request.