How to build your Slim Two

1

When it arrives

What comes in the crate?

The whole cabin, flat-packed: solid timber boards, two benches, the glass door, the clear roof sheet, two steel straps and every fixing, each part with its code.

A sauna packed in its timber crate on pallets, film-wrapped and strapped
Film-wrapped and strapped, on its pallets
Inside the Slim Two: backrest boards on two walls and the round vent valve, before the benches go in
Inside: the backrests, before the benches go in
The full-height glass door of the Slim Two: the timber bar handle and a hinge
The glass door, its bar handle and hinges
The round vent high on the back wall of the Slim Two
The round vent for the back wall
  • The shell: 74 solid timber boards for the floor, walls and curved top, two end walls, the trims and two base beams.
  • Inside: two benches, two backrests and their supports, a floor grating and the drain plate.
  • The glass door: full height, with its bar handle, three hinges, the catch and the seal.
  • The vent: a grille for the outside of the back wall, an adjustable valve for the inside.
  • Straps and fixings: two steel straps, the battens for the top and four sizes of screw, counted by code.
  • The clear roof sheet: over the top, last; or roof shingles for the Slim, if you chose them.

Not in the crate

A 20 kg box of Harvia sauna stones: the Harvia Vega BC60 takes one box
Stones: 20 kg, one box
  • Exterior wood treatment and a brush: a preservative or stain for the outside only, at step 20. Any DIY shop sells it.
  • Sauna stones: the Harvia Vega BC60 takes 20 kg, one box, sold separately.
  • Your tools: the list is on page 7 of the manual.
  • The heater circuit: your electrician’s work, not in our price.
Added the LED lighting kit or roof shingles for the Slim? The kit goes in with the benches, at stage 6; the shingles go on in place of the clear sheet, at stage 9.
2

Before you build

What do you need before you start?

Two people, the tools on page 7 of the manual, every part counted, and the base ready, level and square.

  • Two peopleTwo people make it easier, above all while the end walls stand and the first boards go on. Rather not build it? Find a local fitter.
  • The manual, read firstRead it all before you start and keep it with the cabin: every one of the 20 steps is drawn.
  • Every part thereCount the parts against pages 5 to 7. Short or damaged? Note it on the delivery note, take photos and tell us within 14 days: we replace it free.
  • Within two weeksKeep the timber flat and dry until it goes in, and build within two weeks of delivery: timber that sits damp can warp.
  • The spot and the baseClose to the house, the glass door towards the fence or the house, with room to walk round it; the base ready, as in the next chapter.
  • Your electrician, bookedThe heater needs its own circuit from the consumer unit: a qualified electrician’s job, not in our price. Book it before delivery.

Tools · page 7 of the manual

  • Cordless drill-driver
  • Spirit level
  • Tape measure
  • Spanner
  • Ø50 mm spade bit
  • Ø5 mm drill bit
  • Mallet
  • Pencil
  • Knife
  • Brush
  • Step ladder

Work on the top from a stable step ladder, never from the benches.

3

Before you build

What base does it need?

A firm, level base for the 160 × 120 cm footprint: a concrete slab, paving slabs or compacted gravel, level in both directions. The cabin stands on its own two base beams, 1300 mm apart.

The Slim Two on a pad of paving slabs in a garden, seen from the front
Paving slabs, level in both directions
The two timber base beams under the Slim Two, the rounded lower corner and a steel strap
Two base beams carry the floor
Drawing from the Slim Two manual, page 8: two base beams 1300 mm apart, side 1 equal to side 2
Square: both diagonals equal

How it stands on the ground

  • Two beams, 1300 mm apartThe base beams, 1200 × 70 × 90 mm, go down parallel; every floor board is screwed to both.
  • Square and levelMeasure both diagonals: when they are equal, the beams are square. Then check both with the level.
  • Level in both directionsA concrete slab, paving slabs or compacted gravel, for the 160 × 120 cm footprint.
  • Free-drainingNo mains water is needed: keep the base free-draining, so the beams never sit in water.
4

Building it

How is it built, step by step?

In the manual’s order: the base beams and the floor, the end walls and the boards up and over the curve, the battens and straps, the trims, benches and door; then the outside treated and the roof sheet on.

1

Before step 1 · manual pages 5 to 7

Unpack and sort the parts

Photographing the crate at the kerb before signing the delivery note
Drawing from the Slim Two manual, page 5: every part of the cabin drawn apart
Manual, page 5

Lay everything out by code and count it against the parts lists on pages 5 to 7: every part has its code and its number.

  • Before you sign: photograph the crate and note any damage on the delivery note.
  • Boards, end walls, trims, beams, benches and fittings, each in their own pile.
  • Four sizes of screw, by code: 14.1, 14.2, 14.4 and 14.5. Each step names the one it needs.
  • Anything short or damaged? Tell us within 14 days and we replace it free, delivery included.
2

Steps 1 to 5 · manual pages 8 to 12

Lay the base beams and the floor

Inside the Slim Two, looking out: the floor boards and the door opening
Drawing from the Slim Two manual, page 9: the first floor board across the middle of the two beams
Manual, page 9
Drawing from the Slim Two manual, page 11: the floor screwed down and the 50 mm drain hole
Manual, page 11

Two base beams, parallel and 1300 mm apart, square and level; then the floor boards from the middle out, the drain hole and its plate.

  • Both diagonals equal and both beams level before the first board goes down.
  • The first board, 1.2, across the middle, with the same overhang on both beams; the rest in three moves, out to both sides.
  • Treat the underside of each floor board before it goes down.
  • The Ø50 mm drain hole in the middle of the floor, the drain plate over it, then Ø5 mm holes through the board ends, as page 12 shows.
3

Steps 6 to 8 · manual pages 13 to 15

Stand the end walls, build up the walls

Drawing from the Slim Two manual, page 13: the two end walls standing on the floor, the vent in the back one
Manual, page 13
Drawing from the Slim Two manual, page 14: the wall boards going up both sides in three moves
Manual, page 14
Drawing from the Slim Two manual, page 15: the boards carried over the curve until they meet
Manual, page 15

Both end walls stand on the floor; then the boards go up both sides and over the curve until they meet across the top.

  • The front wall 2.1, with the door opening, and the back wall 2.2, with the round hole, centred on the middle board.
  • A batten across the top holds them upright while the boards go on.
  • The vent now: the adjustable valve 11.2 inside the back wall, the grille 11.1 outside.
  • Every board in the same three moves, up both sides and over the curve.

Every board, in three moves

  • Tap it homeWith the mallet, tight against the board before.
  • Screw through its edgeInto the board before, with a 14.1 screw, as the detail shows.
  • Then the endsInto both beams on the floor; into the end walls up the sides and over the top.
4

Steps 9 and 10 · manual pages 16 and 17

Battens along the top, then the straps

The Slim Two with its walls, battens and straps on, before the outside is treated
Drawing from the Slim Two manual, page 16: the battens along the top, outside and inside
Manual, page 16
Drawing from the Slim Two manual, page 17: a steel strap joined on the side wall with brackets, a rod and nuts
Manual, page 17

A batten along the middle of the top outside, with a block at each end, and one inside; then the two steel straps, tightened evenly.

  • Outside: the batten 5.1, 1540 × 90 mm, along the middle of the top, with a block 5.3 at the front and at the back. Inside: the batten 5.2, 1380 × 90 mm.
  • One strap 13.3 near each end, its ends joined on the side wall with two brackets, a threaded rod and two nuts.
  • Tighten the nuts evenly with the spanner.
5

Steps 11 to 13 · manual pages 18 to 20

Trims, door seal and door frame

Drawing from the Slim Two manual, page 18: the curved and straight trims on the end walls
Manual, page 18
Drawing from the Slim Two manual, page 19: the door seal round the door opening
Manual, page 19
Drawing from the Slim Two manual, page 20: the door frame, head, post and sill
Manual, page 20

The trims round both end walls, the seal round the door opening, then the door frame: head, post and sill.

  • Curved trims 3.4 round the upper corners, straight trims 3.5 across the top of both end walls.
  • The door seal 12.5 round the door opening in the front wall, where the line shows.
  • The head 3.1 at the top, the post 3.3 on the hinge side and the sill 3.2 at the bottom, screwed on from inside.
6

Steps 14 and 15 · manual pages 21 and 22

Bench supports, benches and backrests

The Slim Two cut open along one side: the upper and lower benches and two backrests across the back wall, shown with the heater and the lighting, both options
Drawing from the Slim Two manual, page 21: the bench supports at 300, 705 and 1050 mm
Manual, page 21
Drawing from the Slim Two manual, page 22: the upper and lower benches and the two backrests
Manual, page 22

The supports go on the side walls at 300, 705 and 1050 mm from the floor; the two benches sit on them and the backrests go on behind.

  • The supports 8.1 to 8.4 at the heights in the drawing: the left and right walls are mirror images.
  • The upper bench 9.1, 1100 × 550 mm, and the lower one 9.2, 1100 × 400 mm, fixed to their supports.
  • The backrests: 6.1, 1000 × 240 mm, on the back wall and 6.2, 500 × 240 mm, on the side wall.
  • Added the LED lighting kit? Fit it now, while the benches go in, as its fitting guide shows.
7

Steps 16 to 18 · manual pages 23 to 25

Hang the glass door

The door catch on the timber frame of the Slim Two
Drawing from the Slim Two manual, page 23: the three hinges tapped into the door frame
Manual, page 23
Drawing from the Slim Two manual, page 24: the glass door hung on its hinges, the parts in order 1 to 6
Manual, page 24
Drawing from the Slim Two manual, page 25: the bar handle and the catch
Manual, page 25

Three hinges into the frame, the glass door hung on them and adjusted until it sits evenly, then the handle and the catch.

  • Tap the three hinges 12.2 into the door frame with the mallet, where shown.
  • The hinge parts in the order 1 to 6, then adjust the hinges until the door sits evenly in its frame.
  • The handle 12.3, one bar each side of the glass, and the catch 12.4 on the frame.
8

Steps 19 and 20 · manual pages 26 and 27

Lay the grating, treat the outside

The Slim Two from the back, the outside treated: the rear wall and its round vent
Drawing from the Slim Two manual, page 27: the outside treated with a brush
Manual, page 27

The floor grating goes in; then the outside, walls and top, gets an exterior wood preservative or stain.

  • The floor grating 7.1 laid on the floor.
  • Outside only, walls and top, before the first session and the first winter.
  • The inside stays bare wood: walls, floor, benches and backrests.
  • Pick a dry day above +10 °C.
9

After step 20

Roof sheet, then a last check

The clear roof sheet over the top of the Slim Two, screwed down under a batten along the side, and a steel strap
Drawing from the Slim Two manual, page 4: the finished cabin
Manual, page 4

The clear roof sheet from the kit goes over the top last. Then walk round once before the heater goes in.

  • On the cabin in the photo, the sheet is screwed down under a batten along the side. Not sure how to fix yours? Ask us before you start.
  • Chose roof shingles for the Slim? They go on in place of the clear sheet.
  • Last walk round: the straps tightened evenly, the door closing onto its catch, the vent valve turning freely, the outside treated and dry.
5

Building it

How does the heater go in?

On its own bracket on the wall, where Harvia’s manual puts it. Then a qualified electrician runs its own circuit, makes the connection and certifies the work: that is not in our price.

The Harvia Vega BC60 on the wall, filled with stones
The Harvia Vega BC60, filled with stones
The Harvia Vega BC60: the timer and temperature knobs on the front
Timer and thermostat on the front
  • Harvia Vega BC60: chosen in the build, 6 kW and wall-mounted, with the timer and thermostat on the heater; Harvia rates it for rooms of 5 to 8 m³.
  • Where it goes: Harvia’s manual, in the heater box, gives the spot, the fixing and the clearances round it: follow it.
  • The supply: its own circuit from the consumer unit, in rubber cable of type H07RN-F or equivalent, as Harvia specifies. PVC is not permitted.
  • Your electrician: fits the supply, makes the connection and certifies the work.
  • Stones: 20 kg, one box, sold separately, loaded as Harvia’s manual sets out.
6

Building it

Where is the full manual?

In one 30-page manual: every part and its code on pages 5 to 7, the 20 drawn steps on pages 8 to 27 and the heater on page 28. The drawings show the cabin without the heater.

The whole manual: 30 pagesDownload the PDF