How to build your Barrel Three

1

When it arrives

What comes in the crate?

The whole barrel in one timber crate, 2.4 × 1.2 × 1 m: wall boards, end-wall panels, two cradles, the floor, two benches, the glass door, the shingles, two steel straps and every fixing, each part with its code.

A sauna crate, film-wrapped and strapped on its pallets
Film-wrapped and strapped, on its pallets
Inside The Barrel Three: two benches with backrests and the Harvia heater at the far end
Inside: two benches and the heater
The back wall of The Barrel Three, with the round vent cover
The vent, in the back wall
  • The barrel: wall boards 1.8 m long, the end-wall panels for the door end and the back, two base cradles and the floor.
  • Inside: two alder benches, 154 × 50 cm, with their legs and backrests, and a floor duckboard.
  • The glass door: 8 mm toughened glass, 1770 × 690 mm, in its frame, with a turned timber handle and a roller catch.
  • The roof: bitumen shingles, with the roofing nails and two starter battens.
  • Straps and fixings: two steel straps with their clamps, and every screw and nail, bagged by size.
  • Vent and drain: an adjustable inlet and an extract grille for the back wall, and a stainless drain plate.
  • The heater: the Harvia you chose in the build travels in the same crate.
A sauna crate, film-wrapped and strapped on its pallets
Film-wrapped and strapped, on its pallets
The Barrel Three from the front: the glass door with its timber knob, the stove behind the glass
The glass door, from the front
  • The barrel: wall boards 1.8 m long, the end-wall panels for the door end and the back, two base cradles and the floor.
  • Inside: two alder benches, 154 × 50 cm, with their legs and backrests, and a floor duckboard.
  • The glass door: 8 mm toughened glass, 1770 × 690 mm, in its frame, with a turned timber handle and a roller catch.
  • The roof: bitumen shingles, with the roofing nails and two starter battens.
  • Straps and fixings: two steel straps with their clamps, and every screw and nail, bagged by size.
  • Vent and drain: an adjustable inlet and an extract grille for the back wall, and a stainless drain plate.
  • The stove and its flue kit: the stove, its stand, stone guard and heat shields, and the flue Ø115 mm to the rain cap, in the same crate.

Not in the crate

A 20 kg box of Harvia sauna stones – Barrel Three electric sauna
Stones: 20 kg a box
  • Exterior wood treatment and a brush: a preservative or stain for the outside only, at stage 5. Any DIY shop sells it.
  • Expanding foam and bituminous sealant: the foam for the roof joint and the door frame, the sealant for the roof: one or two cartridges.
  • Your tools: the list is on page 3 of the manual.
  • Sauna stones: a full 80 kg for the Harvia Cilindro, 20 kg for the Vega BC60, sold separately in 20 kg boxes.
  • The heater circuit: your electrician’s work, not in our price.
A 20 kg box of Harvia sauna stones – Barrel Three wood-fired sauna
Stones: 20 kg a box
  • Exterior wood treatment and a brush: a preservative or stain for the outside only, at stage 5. Any DIY shop sells it.
  • Expanding foam and bituminous sealant: the foam for the roof joint and the door frame, the sealant for the roof: one or two cartridges.
  • Your tools: the list is on page 3 of the manual.
  • Sauna stones: the ETNA 12 takes a full 80 kg, sold separately in 20 kg boxes.
  • Under and round the stove: a non-combustible plate under it, high-temperature flue sealant and rock wool for round the firebox.
Added extras? A black-framed door, with clear or matt glass, comes fitted in its frame; the Black Edition brings graphite shingles in place of the standard ones, with the black door. The LED lighting kit goes in with the benches, at stage 4.
Chose the panoramic back wall? A half-round 2100 × 1050 mm panel of 8 mm toughened glass in the upper back wall: it is built into the barrel, so we confirm the layout with you before the factory builds it.
2

Before you build

What do you need before you start?

Two people and ordinary tools, the manual read through, every part counted, and the base ready, level and square.

  • Two people, a weekendTwo people can build it in a weekend, with ordinary tools: no crane and no special kit. Rather not build it yourselves? A local joiner can quote from the manual.
  • The manual, read firstOne manual covers both versions. Its sheets carry no step numbers, so this guide gives its page numbers: read it all before you start.
  • Every part thereCount the parts against the lists at the front of the manual. Short or damaged? Note it on the delivery note, take photos and tell us within 14 days: we replace it free.
  • Within two weeksKeep the parts flat, dry and off the ground, under cover, and build within two weeks of delivery: timber that sits damp can warp.
  • The spot and the baseClose to the house, the glass door towards the fence or the house, with room to walk round it and reach the straps; the base ready, as in the next chapter.
  • A dry day for the outsideThe outside is treated during the build, before the straps go on: keep a dry day above +10 °C for it.

Tools · page 3 of the manual

  • Cordless drill-driver, TORX T25 and PZ2 bits
  • Drill, Ø8 mm bit
  • Jigsaw
  • Rubber mallet
  • Hammer
  • Knife
  • Two spanners
  • Tape measure
  • Spirit level
  • Sealant gun

Work on the roof from a stable step ladder, never from the benches.

Electric: book your electrician before delivery. The heater needs its own circuit from your consumer unit, fitted and certified by a qualified electrician: not in our price.
Wood-fired: check with your council that you can burn wood at your address, as the stove is not on Defra’s exempt-appliance list, and book the Part J sign-off: building control, or a registered installer.
3

Before you build

What base does it need?

A firm, level base the size of the footprint, 185 × 220 cm: a concrete slab, paving slabs or compacted gravel, level in both directions. The barrel stands on its own two cradles, 1425 mm apart.

The Barrel Three on a pad of paving slabs in a garden, seen from the door end: the glass door and a cradle
On a pad of paving slabs, the size of the footprint
  • Two cradles, 1425 mm apart: treated before they go down, level and parallel; the floor is screwed to both.
  • Square: measure both diagonals; when they are equal, the cradles are square.
  • No bigger than the footprint: a base that sticks out past the walls holds rain against them.
  • Free-draining: no mains water is needed; the floor drain empties under the barrel, so the ground beneath must drain freely.
4

Building it

How is it built, step by step?

In the manual’s order: the cradles and the floor, the end walls and the boards up and over, the drain plate and benches; then the outside treated, the straps, the vent and roof joint, the door and the shingles.

Wood-fired: three more jobs fit into this order, marked 3a, 6a and 9a below: the stove opening, the stove and its flue, and the flashing round the flue. They are drawn on pages 12, 16 to 20 and 28; the stove and flue set is listed on page 7.
1

Before you start · manual pages 3 to 7

Unpack and sort the parts

Photographing the crate at the kerb before signing the delivery note
Drawing from the Barrel Three manual, page 6: the cradles, wall boards, end-wall panels and trims, each with its code
Manual, page 6

Lay everything out by code and count it against the parts lists: every part has its code and its number.

  • Before you sign: photograph the crate and note any damage on the delivery note.
  • Wall boards, end-wall panels, cradles, floor, benches and trims, each in their own pile.
  • The fixings come bagged by size, each with its code; every page of the manual lists the ones it needs.
  • Anything short or damaged? Tell us within 14 days and we replace it free, delivery included.
2

Manual pages 8 and 9

Set the cradles, lay the floor

The Barrel Three from its long side: the two cradles under it and two steel straps round it
Drawing from the Barrel Three manual, page 8: two cradles 1425 mm apart, both diagonals equal
Manual, page 8
Drawing from the Barrel Three manual, page 9: the drain board across the cradles and the floor boards out from it
Manual, page 9

Two treated cradles on the base, 1425 mm apart, square and level; then the drain board across them and the floor boards out from it.

  • Treat both cradles before they go down, as page 8 shows.
  • Both diagonals equal and both cradles level before the first board goes down.
  • The drain board across the middle first, then the floor boards out from it, each one tapped home and screwed.
  • Treat the underside of the floor boards before they go down: outside only.
3

Manual pages 10 and 11

Stand the end walls, build up the walls

The Barrel Three with its walls up and over, before the outside is treated
Drawing from the Barrel Three manual, page 10: the floor drilled and the lower end-wall panels stood on it
Manual, page 10
Drawing from the Barrel Three manual, page 11: the side boards up and over, the upper end-wall panels, the last gap closed with strips
Manual, page 11

The lower end-wall panels stand on the floor; then the side boards go up and over the top as the upper panels go in, and the last gap is closed with strips cut from a board.

  • Drill the floor where page 10 marks it, with the Ø8 mm bit, then stand the lower panels of both end walls.
  • The side boards go up both sides and over the top, each one screwed, and the upper end-wall panels go in as they rise.
  • The last gap at the top is closed with strips cut from a board, as page 11 shows.
3a

Wood-fired · manual page 12

Cut the stove opening

The ETNA 12 wood-burning sauna stove in its stone guard, its fire door on a tunnel through the wall
Drawing from the Barrel Three manual, page 12: the back wall with the 440 × 740 mm stove opening
Manual, page 12

In the back wall, 440 × 740 mm, where the firebox of the stove passes through: the stove in the price is fed from outside.

  • Mark it where page 12 draws it, low in the back wall, and cut it with the jigsaw.
  • Chose another stove? Follow its own manual, and ask us before you cut.
4

Manual pages 12 and 13

Drain plate, benches and backrests

The Barrel Three with its glass door open: the two benches and the floor inside
Drawing from the Barrel Three manual, page 12: the drain plate screwed over the hole in the drain board
Manual, page 12
Drawing from the Barrel Three manual, page 13: the two benches on their legs, the backrests and the floor duckboard
Manual, page 13

The temporary battens come off the end walls and the drain plate goes on; then two benches go in on their legs, a backrest above each, with the floor duckboard between them.

  • The stainless drain plate over the hole in the drain board, with four screws.
  • The benches, 154 × 50 cm, one along each side, at the heights page 13 gives.
  • A backrest on the curved wall above each bench, and the floor duckboard down the middle.
  • Added the LED lighting kit? Fit it now, while the benches go in, as its fitting guide shows.
5

Manual page 14

Treat the outside

The Barrel Three from the front, the outside treated: the glass door in the round end wall, shown with the black roof, an option
Drawing from the Barrel Three manual, page 14: the outside treated from the base up to 1.5 m
Manual, page 14

Before the straps go on: the curved walls from the base up to 1.5 m, where the manual marks it, and both end walls in full.

  • Outside only, with an exterior wood preservative or stain: the inside stays bare wood, benches and backrests included.
  • Both end walls in full: the shingles do not cover them.
  • Higher up, the shingles cover the boards, from the starter battens at 1.4 m.
  • Pick a dry day above +10 °C.
6

Manual page 15

Fit the steel straps

The Barrel Three from the side: two steel straps round it, the shingle roof and the cradles
Drawing from the Barrel Three manual, page 15: two straps round the barrel, joined with clamps, a threaded rod and nuts
Manual, page 15

Two steel straps round the barrel, each joined with its clamps and a threaded rod, and tightened evenly with two spanners.

  • One strap near each end of the barrel, as page 15 shows.
  • Each strap joined with two clamps, a threaded rod and two nuts.
  • Tighten the nuts evenly with the two spanners, until each strap sits snug.
6a

Wood-fired · manual pages 16 to 20

Fit the stove and its flue

Drawing from the Barrel Three manual, page 16: the 285 × 285 mm flue hole, 150 mm from the back wall, and the roof plate
Manual, page 16
Drawing from the Barrel Three manual, page 17: for the standard stove, 400 mm cut off one floor section, fixed as a separate piece
Manual, page 17
Drawing from the Barrel Three manual, page 19: the stove at the back wall, heat shields inside and out, rock wool round the firebox
Manual, page 19
Drawing from the Barrel Three manual, page 20: the flue sections up through the roof, in order
Manual, page 20

Before the vent, the door and the shingles: the flue hole in the roof boards, the floor by the stove, the stove in its stone guard with its heat shields, then the flue up through the roof.

  • A 285 × 285 mm hole in the roof boards, 150 mm from the back wall, with the roof plate over it.
  • For the standard stove only: 400 mm cut off one floor section, fixed as a separate piece.
  • The stand and the stone guard round the stove; the stove at the back wall, its firebox through the opening, a heat shield inside and one outside, and rock wool round the firebox.
  • The flue sections up through the roof in the order page 20 numbers them, rock wool round the flue where it passes through: page 22.
  • Not in the kit: a non-combustible plate under the stove and high-temperature flue sealant.
7

Manual pages 21 and 22

Fit the vent, seal the roof joint

Inside The Barrel Three: two benches with backrests and the round vent cover high on the back wall
Drawing from the Barrel Three manual, page 21: the adjustable inlet inside the back wall and the grille outside
Manual, page 21
Drawing from the Barrel Three manual, page 22: the batten along the top inside, expanding foam along the joint, trimmed off
Manual, page 22

The vent goes through the back wall; then, along the top, a batten inside and expanding foam in the joint.

  • The adjustable inlet on the inside of the back wall, the grille on the outside.
  • Inside, along the top: the batten under the joint, with a block at each end, as page 22 shows.
  • From outside, expanding foam along the joint at the top; cut off what stands proud with the knife.
8

Manual pages 23 to 26

Hang the glass door

The glass door of The Barrel Three open, the hot room behind it
The Barrel Three treated and strapped, the glass door in, before the shingles go on
Drawing from the Barrel Three manual, page 23: the door frame screwed into the end wall and set in foam
Manual, page 23
Drawing from the Barrel Three manual, page 26: the timber knob through the glass and the door catch
Manual, page 26

The door frame goes into the opening, screwed and set in expanding foam; then the trims outside and in, the timber knob and the catch.

  • The frame into the door opening, screwed through with a cap over each screw head, and foam in the gap round it: page 23.
  • The trims round the frame, outside and in: pages 24 and 25.
  • The turned timber knob through the glass, and the roller catch that holds the door shut: page 26.
9

Manual page 27

Shingles, then a last check

The Barrel Three finished in a garden, three-quarter view: the glass door and the shingle roof
The Barrel Three in a garden, three-quarter view, shown with the black roof, an option
Drawing from the Barrel Three manual, page 27: starter battens at 1.4 m on each side, then the shingles nailed in rows
Manual, page 27

A starter batten on each side at 1.4 m, then 60 shingles nailed on in rows up to the top. With the roof finished, walk round once before the heat goes in.

  • The starter battens first, one on each side at 1.4 m, as page 27 shows.
  • The shingles in rows from the battens up to the top, each one nailed down.
  • Last walk round, the roof finished: the straps tightened evenly, the door closing onto its catch, the vent turning freely, the outside treated and dry.
9a

Wood-fired · manual page 28

Flashing and rain cap

The wood-fired Barrel Three cut open along one side: the stove on the back wall and the flue up through the shingle roof
A 3D view into the wood-fired Barrel Three: the stove in its stone guard on the back wall, and its flue
Drawing from the Barrel Three manual, page 28: the flashing round the flue, nailed and sealed into the shingles, and the rain cap
Manual, page 28

With the shingles on, the flashing goes over the flue and is sealed into them; the rain cap goes on top.

  • The flashing over the flue, nailed down with 12 roofing nails and sealed into the shingles with bituminous sealant.
  • The rain cap on top of the flue.
  • Before the first fire: the Part J sign-off, from building control or a registered installer.
5

Building it

How does the heater go in?

It stands on the back wall, between the benches, where Harvia’s manual puts it. Then a qualified electrician runs its own circuit, makes the connection and certifies the work: that is not in our price.

Inside The Barrel Three: a bench on each side and the Harvia heater behind its guard at the far end
On the back wall, between the benches
  • Harvia Cilindro PC70: chosen in the build, 6.8 kW, a pillar heater with its timer and thermostat on it; Harvia rates it for rooms of 6 to 10 m³.
  • Or the PC70E, or the Vega BC60: the PC70E is run by Wi-Fi from a separate BleBox unit outside the hot room; the BC60, 6 kW, hangs on the wall.
  • Where it goes: Harvia’s manual, in the heater box, gives the spot, the fixing and the clearances round it. The drawings in our manual show the wood-fired stove.
  • The supply: its own circuit from the consumer unit, in rubber cable of type H07RN-F or equivalent, as Harvia specifies. PVC is not permitted.
  • Your electrician: fits the supply, makes the connection and certifies the work.
  • Stones: sold separately: a full 80 kg for the Cilindro, 20 kg for the Vega BC60, loaded as Harvia’s manual sets out.
5

Building it

What does the stove need?

It goes in with the build, at steps 3a, 6a and 9a, and comes with its flue kit in the price. Before the first fire, building control or a registered installer signs it off under Part J; it takes a full 80 kg of stones.

Inside a wood-fired barrel sauna: the stove in its cage of sauna stones at the back wall, the flue rising from it
The stove in its stone guard
  • The ETNA 12, in the price: behind its stone guard on the back wall, between the benches, fed from outside through the back wall.
  • The flue kit: single-wall pipe Ø115 mm, a damper, a transition, a twin-wall pipe Ø115/195 mm, heat shields, a rosette, roof flashing 450 × 450 mm and a rain cap.
  • Maker’s rating: rooms of 6 to 12 m³; logs up to 400 mm.
  • Room behind the barrel: the stove is fed from the back, so leave standing room there.
  • The sign-off: fitting a stove and flue is building work under Part J in England and Wales: building control, or a registered installer.

Stoves you can choose

StoveFed fromGlass fire doorStones, sold separately
ETNA 12 (standard)Outside, through the wallNoA full 80 kg
ETNA 12 SNInside the hot roomYes, facing the roomA full 80 kg
Chose another stove? Follow its own manual, and ask us before you cut the opening.
6

Building it

Where is the full manual?

In one 28-page manual for both versions: every part and its code on pages 4 to 7, then the build drawn page by page from page 8. Its sheets have no step numbers: the stages above give its page numbers.

The whole manual: 28 pagesDownload the PDF
Electric: skip the stove pages, 7, 16 to 20 and 28, and leave the stove opening on page 12 uncut.