How to build your Plot 3.14

Watch the assembly videoStart to finish: our own build

The build in numbers

Bolts, screws, one sheet to cut

The galvanised steel frame bolts together, self-drilling screws hold every sheet, and you cut only the two end walls. Base ready before you start.

2
adults
1–3
days, by length
11
steps in the manual
1
sheet to cut

Open the assembly manualAsk about a step

One manual for each arch spacing, 1.00 m and 0.67 m, with the same numbered steps.

1

When it arrives

What comes on the pallet?

The frame, the polycarbonate sheets, both doors, the ground anchors and every fixing, all on one pallet, whatever the length.

A SteelRoot unpacked on the ground: arches, bars, boxes and the rolled sheets
Unpacked: arches, bars, boxed fittings and the rolled sheets
  • The frame: arches, crossbars and two end frames, each with a stable door whose top half opens.
  • Ground anchors: for firm soil, counted for your length.
  • Every bolt and screw: bagged and counted: M6 bolts, nuts and washers, roofing screws and 4.2 mm screws.
  • Free with your order: breather tape for the bottom ends of the roof sheets, solid tape for the cut edges of the end walls, doors and vents, and a plant-support wire.
  • The packing list: to check every part against.

Sheets and boxes for each length

LengthPolycarbonate sheetsBoxes at 1.00 m arch spacingBoxes at 0.67 m arch spacing
4 m3 sheets, 2.1 × 6 m710
6 m4 sheets, 2.1 × 6 m1013
8 m5 sheets, 2.1 × 6 m1316
10 m6 sheets, 2.1 × 6 m1619
12 m7 sheets, 2.1 × 6 m2022
Roof vents are an option you choose in the configurator; the U-profile and arch straps are added on request.
2

Before you build

What do you need before you start?

Two adults, ordinary tools, a dry and calm day or two, and the base ready.

  • Two adultsThe roof sheets are 6 m long: it takes two people. Rather not build it? Find a local fitter.
  • 1 to 3 daysAbout 1 day for 4 m, 2 days for 6 and 8 m, 3 days for 10 and 12 m, once the base is ready.
  • A dry, calm dayA storm on the way? Don’t start on the polycarbonate unless you can finish before it arrives.
  • The manual, to the endRead it first: the base and the anchors come before any panel. Bolt the frame loosely; tighten once it all stands.
  • Every part thereCheck the pallet against the packing list within 14 days of delivery. Short or damaged? Tell us before you start and we send it free.
  • 2 m clear, dead levelAt least 2 m from buildings and fences, on a level base built to the sizes in the next chapter.

Tools · nothing special

  • Cordless drill-driver, PH2 bit
  • M8 spanner or socket
  • Spirit level
  • Tape measure
  • Sharp knife or fine-tooth jigsaw
  • Spade
  • Stepladder
  • Work gloves

You never weld or cut the steel: the frame bolts together and the sheets screw on.

3

Before you build

What base does it need?

A firm, level base 3,200 mm wide and 250 mm longer than the greenhouse: 3.14 m is the arch, and on the ground the frame is 3,000 mm across the outside of the legs. Check that width across the end frames before you cut or pour the base to its final size.

The base marked out: the outer line with open soil inside
Firm, level soil, marked out: the anchors in the box hold it
A SteelRoot Plot 3.14 on a gravel pad over firm soil
Gravel over firm soil: the anchors go through it
A SteelRoot Plot 3.14 on one level line of slabs under the frame
Slabs: one level line under the frame, the fixings well in from the edge
SteelRoot Plot 3.14 on a concrete strip, a galvanised bracket bolted down at the leg
Concrete strip: a bracket bolted down at each leg
SteelRoot Plot 3.14 on timber sleepers, a galvanised bracket screwed down at the leg
Timber sleepers: a bracket screwed into the timber
A finished, level gravel base in a timber frame, a spirit level across it
Or a timber frame, filled and level

Base sizes for each length

LengthFrame footprintBase: build to thisDiagonal of the footprintDiagonal of the base
4 m3,000 × 4,020 mm3,200 × 4,250 mm5,016 mm5,320 mm
6 m3,000 × 6,020 mm3,200 × 6,250 mm6,726 mm7,022 mm
8 m3,000 × 8,020 mm3,200 × 8,250 mm8,563 mm8,849 mm
10 m3,000 × 10,020 mm3,200 × 10,250 mm10,459 mm10,738 mm
12 m3,000 × 12,020 mm3,200 × 12,250 mm12,389 mm12,661 mm

How it stands on the ground

  • On its arch legsAlong the long sides the frame stands on the ends of its arch legs.
  • End frames flatAcross each end, the end frame lies flat on the ground, door included: there is no gap under the door.
  • One continuous lineBuild the base as a continuous line all round, not pads under each leg.
  • Keep 100 mm clearThe arch legs lean outwards as they rise, so just above the ground the frame is wider than the footprint line: don’t build a kerb, sleeper or box tight to it.
4

Building it

How is it built, step by step?

In the manual’s order: the arches and end frames first, the end walls cut and fixed on the ground, then the frame goes up, is anchored and roofed, and the doors go on last.

1

Before step 1 · manual pages 4 and 5

Unpack and sort the parts

A bundle of curved arch sections and a bundle of straight crossbars, with a fixing box, on the factory floor
The crossbar bundles, each with its label: crossbars start and crossbars extension
The fixing box open: the ground anchors and the bagged fixings

Lay everything out by type and check it against the parts list: every part has a code, and pages 4 and 5 show each one with its quantity.

  • Arches, crossbars and end-frame parts each in their own pile.
  • Anything short or damaged? Tell us before you start and we send it free.
2

Step 1 · manual page 6

Bolt the arches together

Arch sections ready to bolt together – SteelRoot Plot 3.14 greenhouse
A bolted joint on the galvanised steel frame – SteelRoot Plot 3.14 greenhouse
Drawing from the assembly manual, page 6 – SteelRoot Plot 3.14 greenhouse
Manual, page 6

Each arch is bolted together from its sections. A 4 m frame has five arches at 1.00 m spacing and seven at 0.67 m.

  • Pre-drilled: the frame bolts together, nothing is welded.
  • Bolts snug, not tight: tighten them fully once the whole frame stands and lines up.
3

Steps 2 to 4 · manual pages 7 to 9

Build the two end frames

End-frame parts laid out – SteelRoot Plot 3.14 greenhouse
Door frames for the two ends – SteelRoot Plot 3.14 greenhouse
Drawing from the assembly manual, page 8 – SteelRoot Plot 3.14 greenhouse
Manual, page 8

Get the door-frame and bottom bars ready with their brackets, build both end frames, then fit an arch over each one.

  • The door frame sits between the bottom bars.
  • The 3,000 mm on page 8 is the frame’s width, not your base’s.
  • Each end has a stable door: its top half opens on its own.
4

Steps 5 and 6 · manual pages 10 and 11 · the only cutting

Mark, fix and cut the end walls

An end arch frame laid on the polycarbonate sheet as the cutting template
A roofing screw going in along the arch of an end wall
Trimming the polycarbonate back to the arch with a knife
Both end walls cut from polycarbonate, laid on the grass
A finished end wall with its door, ready to stand
Drawing from the assembly manual, page 10 – SteelRoot Plot 3.14 greenhouse
Manual, page 10

The end frame is the template: all four end-wall pieces come out of one sheet, and the roof sheets go on whole.

  • Mark from the frame, cut a little outside: the last sheet flat, printed side up, an end wall laid on it, marked round the arch.
  • Screw it on, then trim to the arch: with the end wall flat on the ground, fix the piece with the roofing screws and run the knife along the arch.
  • Cut round the doors last: cut along the gaps round them and both halves open. There is no door to measure.

What keeps the sheet whole

  • Channels run top to bottomOn the finished wall, never sideways.
  • Check before each cutHold the piece in its place, printed side out. A piece cut mirror-wise cannot be turned over.
  • A new blade, light passesScore along a straight edge several times; a fine-tooth jigsaw for the curve.
  • Film on until it is fixedMark on the film and cut through it. Peel it as soon as the sheet is screwed down.
  • Tape each cut edge straight awaySolid tape on the cut edges before the roof sheets go on; breather tape on the bottom ends.
  • A slip is not the endAny UK plastics supplier stocks the same clear twin-wall sheet, and we check your sizes.
5

Step 7 · manual page 12

Stand the frame and fit the crossbars

The arches standing on the cleared plot – SteelRoot Plot 3.14 greenhouse
Arches and crossbars bolted together – SteelRoot Plot 3.14 greenhouse
Drawing from the assembly manual, page 12 – SteelRoot Plot 3.14 greenhouse
Manual, page 12

Stand the two ends and the arches between them, then bolt the crossbars along the length. A stepladder helps.

  • Now tighten the bolts: the whole frame stands and lines up.
  • Longer than 4 m: each extra 2 m adds its own arches and crossbars, listed on page 16 and fitted as page 17 shows.
6

Step 8 · manual page 13

Square, level and anchor

An anchor fixed to the foot of a leg with one screw
An anchor in its hole, ready to back-fill – SteelRoot Plot 3.14 greenhouse
An anchor at a corner of the frame – SteelRoot Plot 3.14 greenhouse
Drawing from the assembly manual, page 13 – SteelRoot Plot 3.14 greenhouse
Manual, page 13

Check both diagonals and the level, then dig in the anchors where the manual marks them: one at every corner, the rest along the length.

  • Each anchor slides into the foot of a leg, takes one screw and is buried in firm soil: no concrete.
  • Anchoring is a condition of the structural warranty.
  • On a hard base the anchors are not used: U-brackets you buy hold it instead.
7

Step 9 · manual page 14

Screw on the roof sheets

Roof sheets going on, arch by arch – SteelRoot Plot 3.14 greenhouse
A roofing screw with its washer, through the sheet
Up close
Drawing from the assembly manual, page 14 – SteelRoot Plot 3.14 greenhouse
Manual, page 14

Whole 2.1 × 6 m sheets go over the arches: no cutting. Breather tape goes on their bottom ends.

  • Self-drilling roofing screws with washers cut their own hole into the steel: space them by eye along each arch, nothing to pre-drill.
  • Every screw has a washer and goes in straight.
  • The roof sheets run whole over the arch, with no joint across the slope.
8

Step 10 · manual page 15

Hang the doors, fit the vents

A door handle fitted to the frame – SteelRoot Plot 3.14 greenhouse
A roof vent open, seen from inside – SteelRoot Plot 3.14 greenhouse
How they open
Drawing from the assembly manual, page 15 – SteelRoot Plot 3.14 greenhouse
Manual, page 15

Hinges and handles on both doors: hold each door leaf level in its frame, then screw the hinges on where it sits right.

  • Roof vents, if you ordered them: a hinged window in the roof with an automatic opener. A wax cylinder opens and closes it, with no power.
  • Solid tape on the cut edges of the doors and vents, as on the end walls.
9

After step 10

Film off, then one last walk round

A finished Plot 3.14 in the sun
The door end of a finished Plot 3.14
Inside a finished Plot 3.14, ready to plant

Peel the protective film as each sheet is screwed down, then walk round once: anchors firm, screws snug, tape sealed.

  • Condensation on a cold morning is normal: the breather tape lets it drain.
  • Then the same walk round once a year: the warranty asks for it.
5

Building it

How is it anchored?

Ground anchors in the box hold it on firm, level soil, without concrete; on a hard base, bolt-down U-brackets you buy hold it instead.

The ground anchors: bent galvanised profile – SteelRoot Plot 3.14 greenhouse
The ground anchors that come with it

Each ground anchor is a bent steel profile. It slides into the foot of a leg, takes one screw and is dug into firm, level soil, with no concrete. There is one at every corner without exception; the manual shows where the rest go.

Set each anchor where your manual marks it. If the number in your box doesn’t match the drawing, ask us before you dig.

An unanchored greenhouse is not covered for structural failure. The conditions are on the SteelRoot warranty tab.

Anchors for each length

LengthAnchors at 1.00 m arch spacingAnchors in the box at 0.67 m
4 m68
6 m810
8 m1012
10 m1214
12 m1416
5.1On a hard base

On concrete, slabs, bricks, sleepers or a timber ring the anchors are not used: a bolt-down U-bracket goes under every leg, with masonry bolts on concrete or slabs and coach screws on timber. They are not supplied, and any builders’ merchant or fixings supplier has them.

6

Building it

Where is the full manual?

One manual for each arch spacing: every part and its code on pages 4 and 5, the 11 drawn steps on pages 6 to 17. Open the one for the arch spacing on your order.

The whole manual: 19 pagesDownload the PDF