Greenhouse care
Through the year
What should I do, and when?
While you build, then at the start of each storm season, once a year on a SteelRoot, every 2 years on a NORDIC, and after any storm.
| When | NORDIC | SteelRoot |
|---|---|---|
| While you build | Treat the frame before the sheets go in | Tape the cut edges and the bottom ends of the sheets |
| Start of each storm season | Inspect the fixings and anchors | Inspect the fixings and anchors |
| Once a year | Nothing extra | Look over the fixing points; touch up bare steel |
| Every 2 years | Re-treat the frame; keep a dated photo | Nothing extra |
| After a storm | Check the anchors and screws | Check the anchors and screws |
Every 2 years · NORDIC
How do I treat a NORDIC timber frame?
Every 2 years, with any exterior wood preservative bought in the UK: the first time before the sheets go in, later with a water-based product and the sheet edges taped.

- The pine is treated with a clear preservative at the factory. The brand and the colour are your choice, and you can paint the frame.
- Untreated pine weathers to a silver-grey. Greying and seasonal shrinkage are how slow-grown pine behaves outdoors.
Once a year · SteelRoot
What does a SteelRoot frame need?
A look over the fixings once a year, and cold-galvanising spray on any bare steel as soon as you notice it.


- Once a year Look over the fixing points: the bolts, the roofing screws and the ground anchors.
- Bare steel Touch it up with cold-galvanising spray as soon as you notice it.
- Near the coast Rinse salt off the frame and look it over more often: salt spray speeds up corrosion of zinc.
- Marks at the fixings Marks from screw heads and small scuffs at the fixing points are normal for galvanised steel.
- Leave the frame as built Use free-standing staging and hang no weight from the frame. Don’t drill it or change the design.
Every season
How should I look after the polycarbonate?
Keep solvents off it, keep the tapes on the sheet ends, and rinse dirt off with clean water. Ask us before you use any cleaning product.

- Rinse with clean water and a soft cloth. White spirit, solvent-based products and timber treatment can cloud or crack polycarbonate: keep them off the sheets.
- SteelRoot: solid tape seals the cut edges of the end walls, doors and vents; breather tape on the bottom ends of the roof sheets lets moisture out and keeps dirt and insects out.
- NORDIC: the top ends of the sheets are taped and the bottom ends left open, so condensation drains instead of turning the sheet green.
- Polycarbonate grows and shrinks with the sun. Screws should be snug, with a washer under every head, but never crushing the sheet.
- The UV-protected side faces out. If a sheet ever comes off, refit it the same way round.
Warm days
How do I keep air moving through it?
Open the doors or windows at both ends so air crosses the greenhouse from end to end. Optional roof vents and SmartVent windows open on their own on a warm day.

SteelRoot
A stable door at each end: the top half opens on its own. Optional roof auto-vents open with a wax cylinder from about +18 °C and close as the air cools, with no power; we recommend one per 2 m of length. The Garden Wide and Gable Wide also have windows in both end walls.
NORDIC
The door at one end and an opening window in the back wall: open both and air crosses from end to end. Optional SmartVent windows open on their own on a warm day.
Storm season
What should I check before wind or cold weather?
Inspect the fixings and anchors at the start of each storm season, secure any roof vent before a storm, and check the anchors and screws afterwards.

- Building in autumn or winter? Don’t start on the polycarbonate if a storm is due before you can finish.
- Keep branches clear of the roof: they drop onto it.
- Snow load depends on where you live. Think about it when you choose the site and the sheets: 6 mm sheets are the choice for heavy snow or winter growing.
We don’t put a wind speed or a snow load on our greenhouses. On a SteelRoot, 0.67 m arch spacing with 6 mm sheets is the strongest build we make: more arches and fixings along the length, and shorter spans of polycarbonate between them. For an exposed plot, read Greenhouses for windy and exposed sites.
If something breaks
What if a part needs replacing?
Send your order number, the part code from your manual (on a NORDIC, its length) and two photos. We identify the part and confirm who pays before anything is sent.
| Case | What the warranty page says |
|---|---|
| Arrived damaged or short | “We replace damaged or missing parts free of charge, delivery included.” |
| An approved warranty claim | “Under the warranty the part is free; the delivery is paid by you.” |
| A part you broke, or one out of warranty | “A part you broke, or one out of warranty, is sold at cost price plus delivery, quoted before you pay.” |

- Missing or damaged on arrival: tell us as soon as you can, ideally within 14 days of delivery, with photos. Unpack & check.
- Bare steel is a touch-up job, not a part: cold-galvanising spray, as soon as you notice it.
- Every NORDIC comes with two spare 1.4 m lengths of timber, and up to two timber parts you broke yourself are free; you pay the delivery.
- A cracked sheet: a production fault is a warranty claim. After impact damage, any UK plastics supplier cuts the same twin-wall sheet, and we confirm the size.
If something breaks
How do I ask for a part?
Email or WhatsApp your order number, the photos and the part code. We reply within 2 working days with the part we have identified and what happens next.
Assembly guidesFind the part code in your manualOpen the guide
WarrantyWhat we cover, and how to claimOpen the page