Climber 2.10: assembly & care
When it arrives
What comes on the pallet?
The frame, the polycarbonate sheets, both doors, the ground anchors and every fixing, all on one pallet.

In the box
- The galvanised steel frame: arches, crossbars and two end frames, each with a stable door whose top half opens.
- Ground anchors for soil.
- Every bolt and screw, bagged and counted: M6 bolts, nuts and washers, roofing screws and 4.2 mm screws.
- Free with your order: breather tape for the bottom ends of the roof sheets, solid tape for the cut edges of the end walls, doors and vents, and a plant-support wire.
- The packing list, to check every part against.
Sheets for each length
| Length | Polycarbonate sheets |
|---|---|
| 4 m | 3 sheets, 2.1 × 6 m |
| 6 m | 4 sheets, 2.1 × 6 m |
| 8 m | 5 sheets, 2.1 × 6 m |
| 10 m | 6 sheets, 2.1 × 6 m |
| 12 m | 7 sheets, 2.1 × 6 m |
Check every partThe parts list from your manual, with a tick for each, and what to do if one is missing or damagedOpen the checklist Before you build
What base does it need?
A firm, level base 2,300 mm wide and 250 mm longer than the greenhouse: build to the base size below, not to the 2.10 in the name. Check the width across the end frames before you cut or pour it to its final size.
| Length | Frame footprint | Base: build to this | Diagonal of the footprint | Diagonal of the base |
|---|---|---|---|---|
| 4 m | 2,100 × 4,020 mm | 2,300 × 4,250 mm | 4,535 mm | 4,832 mm |
| 6 m | 2,100 × 6,020 mm | 2,300 × 6,250 mm | 6,376 mm | 6,660 mm |
| 8 m | 2,100 × 8,020 mm | 2,300 × 8,250 mm | 8,290 mm | 8,565 mm |
| 10 m | 2,100 × 10,020 mm | 2,300 × 10,250 mm | 10,238 mm | 10,505 mm |
| 12 m | 2,100 × 12,020 mm | 2,300 × 12,250 mm | 12,202 mm | 12,464 mm |
How it stands on the ground
- Along the long sides the frame stands on the ends of its arch legs.
- Across each end, the end frame lies flat on the ground, door included: there is no gap under the door.
- Build the base as a continuous line all round, not pads under each leg.
Preparing the groundClear, level and marked out before delivery day, then built to its final sizeOpen the page Before you build
How long does it take, and which tools?
Two adults with ordinary tools, once the base is ready.

Tools
- Cordless drill-driver with a PH2 bit
- Spanner set
- Spirit level and tape measure
- Sharp knife or fine-tooth jigsaw, for the end-wall sheets
- Spade, for the ground anchors
- Stepladder and work gloves
Nothing is welded and you never cut the steel. Read the whole manual before you start, and lay the frame out loosely: tighten the bolts only once the whole frame stands, so any misalignment can still be corrected.
Building it
What is the order of work?
The arches and both end walls first, then the frame, the anchors and the roof sheets, and the doors last.
Shown: a SteelRoot Plot 3.14 build. On this build the end walls went on once the frame stood; your manual fits them to the end frames first: follow its order.
- 1Unpack and sort the parts
Lay everything out by type and check it against the parts list in your manual.
With Your manual
- 2Prepare the base
Clear a level strip the size of your base and mark the outline. On soil, the frame stands straight on the ground.
With Tape measure, string line, spirit level, spade
- 3Bolt up the frame
Join each arch from its sections, stand the end frames, then bolt the arches and the crossbars along the length.
With Drill-driver, spanner, spirit level
- 4Anchor it
On soil, dig a hole at each anchor, screw the anchor to the foot of the arch, check the frame is square, then back-fill and firm. An anchor at every corner; the manual shows where the rest go.
With Spade, drill-driver, spirit level
- 5Cut the end walls
Lay the end-wall sheet flat with its film on, mark the curve of the end frame and cut with a sharp knife.
With Marker, tape measure, sharp knife
- 6Fit the end walls
Hold each piece to the end frame with the channels running up and down, peel the film back where it is screwed, and screw it to the frame and the bottom rail.
With Drill-driver with a PH2 bit, the washered screws
- 7Lay the roof sheets
Bend each sheet over the arches from one side to the other and screw it to every arch. Snug, not crushed: the washer only needs to seal.
With Drill-driver with a PH2 bit, the washered screws
- 8Doors, vents and handles
Hang the doors, fit the roof vents, then the handles, the catches and the door stays.
With Drill-driver, screwdriver
- 9Peel the film and finish
Peel off the protective film, firm the soil along the base, and it is ready to plant.
With Your hands
4.1Cutting the end walls
- It is the one job that takes care. The roof sheets go on whole.
- Hold each piece in its place, UV side out, before you cut: a piece cut mirror-wise can’t be turned over.
- Mark on the protective film, use a new blade and score in light passes; a fine-tooth jigsaw for the curve.
- Tape each cut edge with solid tape straight away, before the roof sheets go on, and peel the film once the sheet is screwed down.
Building it
How is it anchored?
Ground anchors in the box hold it on firm, level soil, without concrete; on a hard base, bolt-down U-brackets you buy hold it instead.

Each ground anchor is a bent steel profile. It slides into the foot of a leg, takes one screw and is dug into firm, level soil, with no concrete. There is one at every corner without exception; the manual shows where the rest go.
Anchors for each length
| Length | Anchors at 1.00 m arch spacing | Anchors at 0.67 m arch spacing |
|---|---|---|
| 4 m | 6 | 8 |
| 6 m | 8 | 10 |
| 8 m | 10 | 12 |
| 10 m | 12 | 14 |
| 12 m | 14 | 16 |
5.1On a hard base
On concrete, slabs, bricks, sleepers or a timber ring the anchors are not used: a bolt-down U-bracket goes under every leg, with masonry bolts on concrete or slabs and coach screws on timber. They are not supplied, and any builders’ merchant or fixings supplier has them.
Building it
What does the manual show, step by step?
15 numbered steps on pages 6 to 21, with every part and its code on pages 4 and 5. Where a step comes in two versions, follow only the one for your arch spacing, 1.00 m or 0.67 m.
1Bolt the arches togetherPage 6. A 4 m frame has five arches at 1.00 m spacing and seven at 0.67 m.
2Get the end-frame bars readyPage 7. The door-frame and bottom bars for both ends, with their brackets.
3Build the two end framesPage 8. The door frame sits between the bottom bars. The width on this page is the frame’s, not your base’s.
4Fit an arch over each end framePage 9.
5Mark the end-wall sheetPage 10. Lay one sheet flat, place the end frames on it and mark round them.
6Fix and cut the end wallsPage 11. UV side out, a screw at every edge, then trim to the frame and cut round the doors.
7Arches and crossbars, 1.00 m spacingPage 12. Stand the arches between the end frames and bolt in the crossbars. A stepladder helps.
8Arches and crossbars, 0.67 m spacingPage 13. The same job with the closer arches.
9Square, level and anchor, 1.00 m spacingPage 14. Check both diagonals and the level, then dig in the anchors: six on a 4 m frame.
10Square, level and anchor, 0.67 m spacingPage 15. Eight anchors on a 4 m frame.
11Roof sheets, 1.00 m spacingPage 16. Whole sheets over the arches, screwed to the steel.
12Roof sheets, 0.67 m spacingPage 17.
13Hang the doorsPage 18. Hinges and handles on both doors.
14Each extra 2 mPages 20 and 21: step 14 for 1.00 m arch spacing, step 15 for 0.67 m. The parts for each 2 m section are listed on page 19.
- Page 22Your base size
- Page 33Page 3
- Page 44Package contents
- Page 55Page 5
- Page 66Step 1
- Page 77Page 7
- Page 88Step 3
- Page 99Page 9
- Page 1010Page 10
- Page 1111Step 6
- Page 1212Step 7
- Page 1313Step 8
- Page 1414Step 9
- Page 1515Step 10
- Page 1616Page 16
- Page 1717Page 17
- Page 1818Step 13
- Page 1919Each extra 2 m
- Page 2020Step 14
- Page 2121Step 15
- Page 2222Page 22
- Page 2323Page 23
After the build
How do I look after it, and get a part?
A yearly look over the fixings and a touch-up wherever bare steel shows; replacement parts are sent on request.

































